Forwards Application for Amend 90 to License DPR-13 & Proposed Changes 91 & 92 Describing Offsite Power Sources & Incorporating Changes Necessary for Implementation of Fire Protection Mods.Fee Encl
ML13322A740
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 04/04/1980
From: Dietch R
Southern California Edison Co
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML13322A741 List:
References
NUDOCS 8004080491
Download: ML13322A740 (2)


Text

Southern California Edison Company P. 0. BOX 800 2244 WALNUT GROVE AVENUE ROBERT DIETCH ROSEMEAD, CALIFORNIA 91770 TELEPHONE VICE RREsDENT 213-572-4144 April 4, 1980 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Gentlemen:

Subject:

Docket No. 50-206 Amendment No. 90 San Onofre Nuclear Generating Station Unit 1 Enclosed are three executed and thirty-seven conformed copies of Amendment No. 90 in Docket No. 50-206.

Amendment No. 90 consists of Proposed Change Nos. 91 and 92 to the Technical Specifications incorporated into Provisional Operating License No. DPR-13 as Appendices A and B.

Proposed Change No. 91 is a request to modify the Basis of the existing.Technical Specifications to describe the offsite power sources to the station which will be operational at the completion of the cutover to the new switchyard which is under construction in conjunction with San Onofre Units 2 and 3.

It is possible that the cutover will not be completed prior to the startup of San Onofre Unit 1 scheduled to commence June 1, 1980, following the refueling outage, so that the minimum number of incoming lines described in the Basis will not be in place. Under these circumstances, the limiting condition for operation as required by the Technical Specifications will still be met since a minimum of two offsite lines will be available prior to startup.

Proposed Change No. 92 is a request to modify the existing Technical Specifications to incorporate the changes required due to the implementation of the Fire S

Protection modifications which will be completed during

/

the refueling outage for Cycle 8 operation.

,c Sc 8004001'4V

Mr. H. R. Denton

-2 It is respectfully requested that Proposed Change Nos. 91 and 92 be reviewed promptly.

It is our desire that such a review be completed and appropriate action taken prior to June 1, 1980 when it is expected that Cycle 8 operation will begin..

Also enclosed is Southern California Edison Company's Check No.

T 016498 dated April 3,

1980, in the amount of $8,000.00 as required by 10CFR170.22.

Very truly yours, Robert Dietch Vice President Enclosures