Updates 900614 Memo Re Safety Issues Mgt Sys Items II.B.3.1 & III.D.3.3.2
ML13322A385
Person / Time
Site: Palo Verde, Columbia, San Onofre  Southern California Edison icon.png
Issue date: 09/25/1990
From: Yuhas G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
NRC
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.B.3, TASK-3.D.3.3, TASK-TM NUDOCS 9009260078
Download: ML13322A385 (1)


Text

MEMORANDUM FOR:

Docket Files 50-397, 50-362, 50-361, 50-528, 50-529, and 50-530 FROM:

Gregory P. Yuhas, Chief Reactor Radiological Protection Branch

SUBJECT:

SAFETY ISSUES MANAGEMENT SYSTEM (SIMS) ITEMS II.B.3.1 AND III.D.3.3.2 This memorandum updates my previous memorandum dated June 14, 1990.

The current SIMS printout lists II.B.3.1 as "6" for WNP-2, SONGS 2, 3, and Palo Verde.

Closure of Item II 8.3.1 -is a verification that the licensee had established an interim post-accident sampling capability until the long term system meeting the criteria expressed in NUREG 0737 had been established.

Since WNP-2, SONGS 2, 3, and Palo Verde were not licensed prior to 1982, they did not require interim systems; they did not establish interim systems; and their actual post-accident sampling systems were inspected and addressed with the issuance of an operating license. Accordingly, "NA" will be entered for the "Final Inspection Date" for these facilities.

The SIMS printout should list "NA" in the "verify complete column for Palo Verde Units 1, 2, and 3 for item III.D.3.3.2 since they did not receive fuel loading licenses until after January 1, 1981.

Gregory P. Yuhas, Chief Reactor Radiological Protection Branch cc:

P. Eng, NRR/PD31 G. Klinger, NRR/ILPB S. Richards, RV F. Wenslawski, RV C. Trammell, NRR/PD5 J. Tatum, NRR/PD5 RV/gmd GYuhas O9/v/9o 09/ /90 EST COPY j REQUEST COPY ] REQUEST COPY J REQUEST COPY j TO PDR ]