ML13322A181
| ML13322A181 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 08/22/1986 |
| From: | Crutchfield D Office of Nuclear Reactor Regulation |
| To: | Rood H Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML13322A182 | List: |
| References | |
| TAC-57736, TAC-57737 NUDOCS 8608260375 | |
| Download: ML13322A181 (2) | |
Text
August 22, P86 Docket Nos.:
50-361/362 MEMORANDUM FOR:
Harry Rood, Project Manager Project Directorate #7 Division of PWR Licensing-B FROM:
Dennis M. Crutchfield, Assistant Director Division of PWR Licensing-B
SUBJECT:
SONGS 2 AND 3 FUEL SHOULDER GAP CLEARANCE (TAC# 57736 & 57737)
Plant Name:
San Onofre Nuclear Generating Station Units 2 and 3 Responsible PD:
Project Directorate #7 Project Manager:
Harry Rood Review Branch:
Reactor Systems Review Status:
Complete The Reactor Systems Branch has reviewed the information provided by Southern California Edison (SCE) based on shoulder gap measurements taken at SONGS 2 at end-of-cycle 2. Based on this, the staff concludes that the Batch C and D fuel assemblies in Cycle 3 and the Batch D assemblies to be loaded in Cycle 4 are acceptable with respect to shoulder gap clearance and that the Unit 2 license commitment has been satisfied. The results are also applicable to Unit 3 operation and satisfies its license condition with regard to shoulder gap clearance.
This completes our effort on TACS 57736 and 57737. Our SER and the applicable SALP input is enclosed.
onaa leloed bp Derji+/-g* Crutch,i]
4 Dennis M. Crutchfield, Assistant Director Division of PWR Licensing-B
Enclosures:
DISTRIBUTION As stated Docket File PDR cc:
W.- Minners RSB File R. Bosnak DCrutchfield C. Berlinger CThomas W. Hodges LKopp G. Knighton NLauben CONTACT:
L. Kopp, RSB/DPLB x28118 OFC
- DPLB:RSBd/DPLB:RSB:SL :DPLB:RSB:BC :DP
- AD
- I NAME :LKopp:jc
- NLauben 14 (e s DCltchfield 7----------------------------------------------------------------------
DATE :8/1q/86
- 8/20/86
- 8140/86
- 8/2/86 OFFICIAL RECORD COPY 8608260375 860822 PDR ADOCK.05000361 P
/'/i
V REGU 0
e UNITED STATES
't NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 August 22, 1986 Docket Nos.:
50-361/362 MEMORANDUM FOR:
Harry Rood, Project Manager Project Directorate #7 Division of PWR Licensing-B FROM:
Dennis M. Crutchfield, Assistant Director Division of PWR Licensing-B
SUBJECT:
SONGS 2 AND 3 FUEL SHOULDER GAP CLEARANCE (TAC# 57736 & 57737)
Plant Name:
San Onofre Nuclear Generating Station Units 2 and 3 Responsible PD:
Project Directorate #7 Project Manager:
Harry Rood Review Branch:
Reactor Systems Review Status:
Complete The Reactor Systems Branch has reviewed the information provided by Southern California Edison (SCE) based on shoulder gap measurements taken at SONGS 2 at end-of-cycle 2. Based on this, the staff concludes that the Batch C and D fuel assemblies in Cycle 3 and the Batch D assemblies to be loaded in Cycle 4 are acceptable with respect to shoulder gap clearance and that the Unit 2 license commitment has been satisfied. The results are also applicable to Unit 3 operation and satisfies its license condition with regard to shoulder gap clearance.
This completes our effort on TACS 57736 and 57737. Our SER and the applicable SALP input is enclosed.
TVCrutchfield, ssistant Director Division of PWR Licensing-B
Enclosures:
As stated cc: W. Minners R. Bosnak C. Berlinger W. Hodges G. Knighton CONTACT: L. Kopp, RSB/DPLB x28118