Provides Response to Amend Application 212,dtd 940906, Requesting Extension to Expiration Date for Songs,Unit 1
ML13319B094
Person / Time
Site: San Onofre 
Issue date: 01/02/1998
From: Larry Wheeler
NRC (Affiliation Not Assigned)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
References
TAC-M90325, NUDOCS 9801130302
Download: ML13319B094 (3)


Text

Mr. Harold B. Ray Senior Vice President Southern California Edison Co.

San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, California 92674-0128

SUBJECT:

AMENDMENT APPLICATION NO. 212, REQUEST FOR EXTENSION OF OPERATING LICENSE EXPIRATION DATE, SAN ONOFRE NUCLEAR GENERATING STATION - UNIT 1 (TAC NO. M90325)

Dear Mr. Ray:

This letter provides the NRC response to your Amendment Application No. 212, dated September 6, 1994, requesting an extension to the expiration date for the San Onofre Nuclear Generating Station (SONGS), Unit 1 Operating (Possession Only) License, DRP-13.

The regulatory requirements for renewal of an operating license for a permanently shut down nuclear power facility have been updated since the submittal of your September 6, 1994, request. Specifically, 10 CFR 50.51(b) states that the license continues in effect beyond the expiration date for a facility that has permanently ceased operations to authorize ownership and possession of the facility until the Commission notifies the licensee in writing that the license is terminated. Therefore, DRP-13 will remain in effect and no specific action is needed to obtain an extension to the expiration date.

Under the current provisions of 10 CFR 50.82(a)(3), decommissioning is to be completed within 60 years of permanent cessation of operations. Therefore, your decommissioning schedule will determine the expiration date for DRP-13.

This response completes NRC action on your September 6, 1994, request. If there are any questions concerning this response, please have your representative contact me at (301) 415-1444.

Sincerely, ORIGINAL SIGNED BY:

Louis L. Wheeler, Senior Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-206 cc: See next page DISTRIBUTION:

E-MAIL HARD COPY SWeiss Region IV PHarris MWebb Docket File 50-206 OGC (015-B18)

RDudley TMarkley LThonus PUBLIC GHiII (2)

MFairtile MMasnik PDND r/f EHylton TFredrichs JMinns JRoe DWheeler PD PM P

- A PDND:(A)S OPD c

eeler E

on MMasnik SWeiss (tb/11/97

/?,/n 197 11,/ 197 1 /.1 19 9

OFFICIAL RECORD COPY DOCUMENT NAME: G:\\SECY\\WHEELER\\SAN90325.LTR 9601130302 980102 PDR ADOCK 05000206 ndlllllllllllllllllllllll P111 POPD

  • QS3D 5

1

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 2, 1998 Mr. Harold B. Ray Senior Vice President Southern California Edison Co.

San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, California 92674-0128

SUBJECT:

AMENDMENT APPLICATION NO. 212, REQUEST FOR EXTENSION OF OPERATING LICENSE EXPIRATION DATE, SAN ONOFRE NUCLEAR GENERATING STATION - UNIT 1 (TAC NO. M90325)

Dear Mr. Ray:

This letter provides the NRC response to your Amendment Application No. 212, dated September 6, 1994, requesting an extension to the expiration date for the San Onofre Nuclear Generating Station (SONGS), Unit 1 Operating (Possession Only) License, DRP-13.

The regulatory requirements for renewal of an operating license for a permanently shut down nuclear power facility have been updated since the submittal of your September 6, 1994, request. Specifically, 10 CFR 50.51(b) states that the license continues in effect beyond the expiration date for a facility that has permanently ceased operations to authorize ownership and possession of the facility until the Commission notifies the licensee in writing that the license is terminated. Therefore, DRP-13 will remain in effect and no specific action is needed to obtain an extension to the expiration date.

Under the current provisions of 10 CFR 50.82(a)(3), decommissioning is to be completed within 60 years of permanent cessation of operations. Therefore, your decommissioning schedule will determine the expiration date for DRP-13.

This response completes NRC action on your September 6, 1994, request. If there are any questions concerning this response, please have your representative contact me at (301) 415-1444.

Sincerely, ouis L. Whe Aer, Senior roject Manager Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-206 cc: See next page

Mr. Harold B. Ray San Onofre Nuclear Generating Southern California Edison Company Station, Unit 1 Docket No. 50-206 cc:

Mr. R. W. Krieger, Vice President Southern California Edison Company San Onofre Nuclear Generating Station P. 0. Box 128 San Clemente, California 92674-0128 Mr. Richard Krumvieda Manager, Nuclear Department San Diego Gas & Electric Company P. 0. Box 1831 San Diego, California 92112 Resident Inspector/San Onofre NPS c/o U.S. Nuclear Regulatory Commission P. 0. Box 4329 San Clemente, California 92674 Mayor City of San Clemente 100 Avenida Presidio San Clemente, California 92672 Chairman, Board of Supervisors County of San Diego 1600 Pacific Highway, Room 335 San Diego, California 92101 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services P. 0. Box 942732 Sacramento, California 94234 Dr. Harvey Collins, Chief Division of Drinking Water and Environmental Management P. 0. Box 942732 Sacramento, California 94234-7320