ML13317B331

From kanterella
Jump to navigation Jump to search
Confirms Implementation of Program in Response to Generic Ltr 89-13 Re Svc Water Sys Problems Affecting safety-related Equipment During Recent Cycle 11 Refueling Outage
ML13317B331
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 04/22/1991
From: Nandy F
Southern California Edison Co
To:
NRC/IRM
References
GL-89-013 NUDOCS 9104230431
Download: ML13317B331 (2)


Text

Southern California Edison Company 23 PARKER STREET IRVINE, CALIFORNIA 92718 April 22, 1991 F. R. NANDY TELEPHONE MANAGER, NUCLEAR LICENSING (714) 454-4504 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

Docket No. 50-206 Generic Letter No. 89-13: Service Water System Problems Affecting Safety-Related Equipment San Onofre Nuclear Generating Station, Unit 1 This letter provides confirmation that we have completed implementation of our program developed in response to Generic Letter 89-13. Generic Letter 89-13, dated July 18, 1989, provided recommended actions to address various problems with service water systems which, in the past, have led to system degradation or failure at some plants. The Generic Letter requires licensees to develop programs to ensure that their service water systems are capable of performing in accordance with their licensing bases. The reporting requirements of Generic Letter 89-13 require two submittals. The first submittal should provide a description of the program to be implemented and was satisfied by our letter dated January 26, 1990. The second submittal should confirm that implementation of our program has been completed and is provided by this letter.

Our Generic Letter 89-13 program was implemented during the recent Cycle 11 refueling outage. The detailed documentation of our program is being retained in appropriate plant records.

PDR PDUD

April 22, 1991 Document Control Desk

-2 If you have any questions, please do not hesitate to call me.

Respectfully submitted, SOUTHERN CALIFORNIA EDISON COMPANY BY:

v F. R. Nandy Manager, Nuclear Licensing State of California County of Orange on April 22,

1991, before me, Mariane Sanchez

, personally appeared F. R. Nandy

, personally known to me (xxpMavadXttxxa Xx to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executed the instrument.

WITNESS my hand and official seal.

Colbe 14 Ites SignaturoM Ocoe 41 cc:

George Kalman, NRC Project Manager, San Onofre Unit 1 J. B. Martin, Regional Administrator, NRC Region V C. W. Caldwell, NRC Senior Resident Inspector, San Onofre Units 1, 2 & 3 C. D. Townsend, NRC Resident Inspector, San Onofre Unit 1