ML13317A817
| ML13317A817 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 01/15/1982 |
| From: | Baskin K Southern California Edison Co |
| To: | Crutchfield D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML13317A820 | List: |
| References | |
| REF-SSINS-6820, TASK-03-06, TASK-3-6, TASK-RR IEB-80-11, NUDOCS 8201190104 | |
| Download: ML13317A817 (1) | |
Text
Southern California Edison Company P. 0. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD. CALIFORNIA 91770 K. P. BASKIN TELEPHONE MANAGER OF NUCLEAR ENGINEERING, Janua 15 1982 (213) 572-1401 SAFETY, AND LICENSING Director, Office of Nuclear Reactor Regulation Attention:
D. M. Crutchfield, Chief Operating Reactors Branch No.
5 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Gentlemen:
Subject:
Docket No. 50-206 287i8 4
SEP Topic 111-6 Masonry Wall Seismic Reevaluation San Onofre Nuclear Generating Station N
Unit 1 In accordance with IE Bulletin 80-11 and SCE's Balance of Plant Structures Seismic Reevaluation Program, the masonry walls at San Onofre Unit 1 are being analyzed.
Two volumes of a report entitled "Seismic Evaluation of Reinforced Concrete Masonry Walls" which discuss the analysis methodology and the results of masonry wall evaluations were submitted to the NRC by letter dated January 11, 1982.
The third volume discussing the evaluation criteria is provided as an enclosure to this letter.
If you have any questions on this information, please let us know.
Very truly yours, Enclosures Ab
-8201190104 e20115 PDR ADOCK 05000206 P