Southern California Edison Company I
P. 0. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD, CALIFORNIA 91770 K. P. BASKIN TELEPHONE MANAGER OF NUCLEAR ENGINEERING, SAFETY, AND LICENSING December 8, 1981 (213) 572-1401 Director, Office of Nuclear Reactor Regulation Attention: D. M. Crutchfield, Chief 4
(a Operating Reactors Branch No. 5 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.
20555 D'
Gentlemen:
Subject:
Docket No. 50-206 Safety Injection System Modifications San Onofe Nuclear Generating Station Unit 1 Our letter dated October 16, 1981 forwarded the report entitled "Safety Injection System Modifications, San Onofre Nuclear Generating Station, Unit 1, October, 1981". The report provided information and commitments related to the recent modifications made to the Safety Injection System (SIS),
including a commitment to submit a schedule to replace the SIS hydraulically operated valves to eliminate the need to trip the feedwater pumps and vent the valve body cavities, and to study the SIS design and performance to determine if major redesign is warranted.
The schedule for each of the above items is discussed below:
- 1.
Replacement of SIS Hydraulically Operated Valves A specification has been prepared and forwarded to seven manufacturers (five provided quotes) for replacement of the subject valves. The manufacturers' proposals have recently been received and will be evaluated by mid-February, 1982. In order to establish an engineering, procurement, construction and startup schedule for replacement of the subject valves, we requested each manufacturer to submit schedular information separate from their proposals.
Based on our review of the schedular information, we have developed the following best estimate schedule:
- a. Drawing Preparation and Review - completed four months after issuance of purchase order
- b. Fabrication, Qualification Testing and Delivery - completed nine to thirty-four months after a. above
- c. Construction and Startup Testing - completed during the next scheduled refueling outage after b. above f100271 811 208 PDR ADOCK 05000206
-R
,K
D.
December 8, 1981 As discussed above, the best estimate shedule has been developed without a detailed review of the manufacturers' proposals.
Since our objective is to install qualified and tested valves, we have included an estimate of minimum and maximum qualification testing and delivery time which is dependent on whether current standards or earlier standards are utilized.
Until we have an opportunity to review and evaluate each manufacturers' proposal in detail, in particular, their qualification testing program, we cannot provide a more definitve schedule. Our plans for issuance of a purchase order to the selected manufacturer and overall schedule for replacement of the subject valves are discussed below.
- 2.
Study of SIS Design and Performance We have completed a conceptual assessment of design alternatives which will be further considered to determine if major redesign of the SIS is warranted.
The design alternatives include:
- a.
Low Pressure and High Pressure SIS Pumps with Boron Injection Tank
- b. SIS Pumps
- c. Feedwater Pumps Figure 1 of this letter shows the existing SIS. Figures 2, 3 and 4 of this letter show the design alternatives discussed above.
We anticipate that an evaluation of the design alternatives can be completed by May, 1982. At that time, we will advise you concerning the results of the evaluation. If we determine that major redesign of the SIS is warranted, we will provide the associated conceptual engineering information for the design alternative adopted, including the projected completion schedule.
If we determine that major redesign of the SIS is not warranted, we will advise you of the basis for our determination.
In summary, we will complete our review and evaluation of the manufacturers' proposals for replacement of the SIS-hydraulically operated valves in mid-February, 1982 and we will complete our study of the SIS design and performance in May, 1982 to determine if major redesign is warranted.
With issuance of a purchase order to the selected manufacturer in mid-February, 1982, the SIS hydraulically operated valves can be delivered by March, 1983, based on a minimum qualification testing and delivery time, or by April, 1985, based on a maximum qualification testing and delivery time.
Following delivery of the new hydraulically operated valves, construction and startup testing activities will be completed during the next scheduled refueling outage. If we determine that major redesign of the SIS is warranted, we will evaluate whether the replacement of the hydraulically operated valves would be more appropriately undertaken as part of the design alternative adopted and will advise you of the results of our evaluation in
- May, 1982 as discussed in Item 2 above.
D.
December 8, 1981 If you have any questions or desire further information concerning the schedules discussed above, please contact me.
Very truly yours, Enclosures (4) cc:
R. H. Engleken, Director, DIE, Region V
FRM. COVP PUMPS 70 STEAM GENERATORS IRWSr cy 5
875A 36CONTA/NMENT Hv 4A 852A 5/5/N SS 534 85/ArS/S SI PUMPS FEEb w4 eg Pu' a-JA C
I 4S/S COLD LEG FRM. CONO. PUMPS 70 57M. GEWE ATORS SI~
51$
/.V 7
B 555/S
/NS/
C OLD LEG I-5 AS L//L T -5 YSTE/1
0.S
-GO L.OL 1.0 mo LOOP C' C04 ccF4 t""
/1190 MO~LT0 MD ZOP'~
TANKJ A Z TEA'NA TI VE 2.
(WW RESSLIARE AND H-IGH PReSS41ic9E.81 1e/A1PS WITH soncw /t4I15CrIQN 7Ar0J
FRM. CON, PUMPS TO S TEAM4 GEWERAOR S EX257.&/AIN PE&D CONrAINM 8
A PU-4P GSA 85A Ih RET/RED P/PING CONNECTION I
NEW LPSI Pump A OWQP (CAPAciTy OF PUMP SAME AS COMS/NATION OF OLD SI PUMPS LEG rRM. COND. PUMPS TO STEAM GENERATORS EXIST M-A/N FEE_
H PUM G 38 HV CONTA/NMENT
_eREP4ACELOO 010SrIM FEEDUCDL)EH (I
- SS' REPLAES OD St f./M NEE PL/MP) pups
FRM. COND, PUMPS TO STEA/
G5NERATcaRS RWST CONTA/NMENT 6 s4A4 P/./MP__
RET/RED P/PING I I
5/.S cONNec /cON I
I (rYRi) 1 S/SI S/SS/S DED/CATED SI PU1MP A 1 zJ SI7 P.(EX/S-FEEDWATER P/MP G-3A) lo "C
S /S/SACOlD LEG FRM. COND. PUMPS 70 57M. GEWVEATORS S/S NEW rEED 6548 0
P I
I S/S IS/S I
J I
L OO P 4 COLD LEG DEr/CATED SI
.PUMP 8 C EK/ST..FED WA TEAR pump G38)
I ALTERNAT-/VE 4 (NEW DED/CAT5D FEDPLMPS)