Responds to 811020 Request for Info Re Auxiliary Feedwater Sys Project.Drawing 567960-1 Shows Details of Turbine Gantry Crane Rails.Drawing 5150247-3 Should Be cross-referenced from Drawing 5149214.Response to 811105 Request by 811211
ML13317A760
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 12/01/1981
From: Blaschke R
SOUTHERN CALIFORNIA EDISON CO.
To: Chuang T
LAWRENCE LIVERMORE NATIONAL LABORATORY
References
SCE-LLL-20, NUDOCS 8112100235
Download: ML13317A760 (2)


Text

Southern California Edison Company P.O. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD, CALIFORNIA 91770 December 1, 1981 SCE/LLL-20 Dr. Tien-Yuh Chuang Lawrence Livermore National Laboratory P.O. Box 808 Livermore, California 94550 Gentlemen:

Subject:

Auxiliary Feedwater System Project San Onofre Nuclear Generating Station Unit 1

References:

A.

Your letter SM-81-284 dated October 20, 1981 B.

Your letter 81-SS-177 dated November 5, 1981 Enclosed is the following information which you requested for the subject project.

1.

Vendor (Harnischfeger Corporation) Drawing Nos. 13F1909, 13F1927, 13H2362 and 14F2816 through 14F2819 showing details of turbine gantry crane wheels.

Please note that SCE drawing 567960-1 which has previously been.sent' to you shows details of the turbine gantry crane rails.

2.

SCE Drawing No. 5150247-3, entitled "Sections and Details Diesel Generator Building Sheet 5."

(Please note that this drawing should have been cross-referenced from SCE Drawing No. 5149214.)

Items 1 and 2 above were requested as items 2 and 3 of Reference A.

In response to item 1 of Reference A, the compressive strength of the concrete for the diesel generator buiTdingJs 4000 psi.

120235 P AD:0c 0 50 2 1

,DR

Dr. Chuang December 1, 1981 The cylinder test data for the concrete used in the Sphere Enclosure Building which you requested in Reference B will be provided by December 11, 1981. It is also understood that you need similar data for the diesel generator building. This latter data will also be sent by December 11, 1981.

If you have any questions on any of this information, please let me know.

Sincerely, R. C. Blaschke Project Engineer Enclosure cc:

(w/o enclosure)

C. Burger (NRC)

K. Herring (NRC)

S. Nowicki (NRC)

P. D. Smith (LLL)'