'A Southern California Edison Company P. 0. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD. CALIFORNIA 91770 K. P. BASKIN October 29, 1981 TELEPHONE MANAGER OF NUCLEAR ENGINEERING, (213) 572-1401 SAFETY, AND LICENSING Director, Office of Nuclear Reactor Regulation Attention:
D. M. Crutchfield, Chief Operating Reactors Branch #5 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Gentlemen:
Subject:
Docket No. 50-206 Safety Injection System Modifications San Onofre Nuclear Generating Station Unit 1 During a meeting with the Regulatory staff on October 22, 1981, we presented the results of the preoperational testing described in the report entitled, "Safety Injection System Modifications, San Onofre Nuclear Generating Station, Unit 1, October, 1981", submitted by letter dated October 16, 1981. In particular, we provided the results of the actuator opening force tests for HV-851A and B on the upstream discs.
At the conclusion of the meeting, the Regulatory staff requested that we perform several additional actuator opening force tests and provide the results of the tests upon completion. Accordingly, enclosed is a tabulation of the SIS valve opening force data for the downstream discs.
The accumulator, manifold and line pressure data are measured quantities whereas the corresponding forces are calculated from these measurements.
Data for the "pre-inspection" runs corresponds to the nine cold flow/lp SIS sequencing tests prior to valve internals inspection as indicated in the aforementioned report. The "post-inspection" data corresponds to the same such test performed following valve internals inspection. Data for the hot SIS test will be provided to you following completion of the test.
If you have any questions or desire further information concerning the enclosed data, please contact me.
Very truly yours, Enclosure cc:
R. H. Engelken, Director, NRC, OIE, Region V 811030344 6119 PDR ADOCK P
PDR)
SIS VALVE PROJECT SAN ONOFRE UNIT 1 OPENING FORCE DATA RUN NO.
HV-851A HV-851B COLD SIS ACCUM'R MAN'D LINE FORCE ACCUM'R MAN'D LINE FORCE RWST LIKE-UP PSIG PSIG PSIG lbf PSIG PSIG PSIG lbf PRE-INSPECTION 1
3200 2200 350 3636 3200 2100 320 5033 2
3200 2200 335 3588 3200 2000 320 6525 3
3200 2200 350 3636 3200 2100 315 5018 4
3200 2200 350 3636 3200 2200 320 3541 5
3100 2200 350 2531 3200 2100 320 5033 6
3200 2200 350 3636 3200 2200 320 3541 7
3200 2200 320 3541 3200 2000 315 6510 8
3200 2200 335 3588 3200 2100 315 5018 9
3200 2200 335 3588 3200 2100
.315 5018 AVERAGE 3189 2200 342 3489 3200 2100 318 5027 COLD SIS RWST LINE-UP POST-INSPECTION 1
3200 2200 350 3636 3200 2200 320 3541 2
3200 2300 345 2128 3200 2300 335 2096 3
3200 2300 350 2144 3200 2300 335 2096 AVERAGE 3200 2267 348 2630 3200 2267 330 2573 HOT SIS