Southern California Edison Company P. 0. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD, CALIFORNIA 91770 K. P. BASKIN TELEPHONE MANAGER OF NUCLEAR ENGINEERING, December 7, 1982 (213) 572-1401 SAFETY, AND LICENSING Director, Office of Nuclear Reactor Regulation Attention: D. M. Crutchfield, Chief Operating Reactors Branch No. 5 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:
Subject:
Docket No. 50-206 Emergency Response Facilities San Onofre Nuclear Generating Station Unit 1
Reference:
Letter, K. P. Baskin, SCE, to F. Miraglia, NRC, Docket Nos. 50-361 and 50-362, March 3, 1982 The following information is offered in response to a request by members of your staff in telephone conversations on December 2, 1982 and to document our conversations of November 22 and 23, 1982:
Request SCE Response
- 1. The distance to the Approximately 1 kilometer San Onofre primary EOF
- 2. The distance to the Approximately 35 miles, the area San Onofre backup EOF presently designated for this use is in Santa Ana, in our southeastern division headquarters
- 3. Type of structure for the 18" poured-in-place concrete structure primary EOF
- 4. Primary EOF Protection factor 120
- 5. Construction - date started 01/01/82) equipment moved in and date completed 09/01/82) EOF declared operational on 10/01/82 8212140151 821207 PDR ADOCK 05000206 F
- 0.
December 7, 1982
- 6.
Is the primary EOF equipped Yes 1 with HEPA filters?
- 7. Backup EOF - structure type Generic office building, not built
- age of building specifically for this purpose, approximately 2 years old
- 8. The distance to the temporary Approximately 4 miles to the interim EOF and backup EOF primary EOF in San Clemente, the interim backup EOF is the same as in 2 above
- 9. Was the EOF approved in the The SER related to the operation of San Onofre Units 2&3 licensing San Onofre Units 20 approved the EOF process?
based upon our position that it would meet the criteria of NUREG-0696.
1 - Page 27 of the report submitted with referenced letter documents this fact.
If you have any questions, please let me know.