ML13317A461

From kanterella
Jump to navigation Jump to search
Responds to 821202 Telcon Request & Documents 821122 & 23 Conversations Re Emergency Response Facilities.Facility Declared Operational on 821001
ML13317A461
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 12/07/1982
From: Baskin K
Southern California Edison Co
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
NUDOCS 8212140151
Download: ML13317A461 (2)


Text

Southern California Edison Company P. 0. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD, CALIFORNIA 91770 K. P. BASKIN TELEPHONE MANAGER OF NUCLEAR ENGINEERING, December 7, 1982 (213) 572-1401 SAFETY, AND LICENSING Director, Office of Nuclear Reactor Regulation Attention: D. M. Crutchfield, Chief Operating Reactors Branch No. 5 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:

Subject:

Docket No. 50-206 Emergency Response Facilities San Onofre Nuclear Generating Station Unit 1

Reference:

Letter, K. P. Baskin, SCE, to F. Miraglia, NRC, Docket Nos. 50-361 and 50-362, March 3, 1982 The following information is offered in response to a request by members of your staff in telephone conversations on December 2, 1982 and to document our conversations of November 22 and 23, 1982:

Request SCE Response

1. The distance to the Approximately 1 kilometer San Onofre primary EOF
2. The distance to the Approximately 35 miles, the area San Onofre backup EOF presently designated for this use is in Santa Ana, in our southeastern division headquarters
3. Type of structure for the 18" poured-in-place concrete structure primary EOF
4. Primary EOF Protection factor 120
5. Construction - date started 01/01/82) equipment moved in and date completed 09/01/82) EOF declared operational on 10/01/82 8212140151 821207 PDR ADOCK 05000206 F

PDR

0.

December 7, 1982

6.

Is the primary EOF equipped Yes 1 with HEPA filters?

7. Backup EOF - structure type Generic office building, not built

- age of building specifically for this purpose, approximately 2 years old

8. The distance to the temporary Approximately 4 miles to the interim EOF and backup EOF primary EOF in San Clemente, the interim backup EOF is the same as in 2 above
9. Was the EOF approved in the The SER related to the operation of San Onofre Units 2&3 licensing San Onofre Units 20 approved the EOF process?

based upon our position that it would meet the criteria of NUREG-0696.

1 - Page 27 of the report submitted with referenced letter documents this fact.

If you have any questions, please let me know.

Very truly yours,