RE9.ATORY INFORMATION DISTRI*ION SYSTEM (RIDS)
ACCESSION NBR:8010060266 DOC.DATE: 80/09/22 NOTARIZED: NO DOCKET #
FACIL:50-206 San Onofre Nuclear Station, Unit 1, Southern Californ 05000206 AUTH.NAME AUTHOR AFFILIATION CURRANJ.M.
Southern California Edison Co.
RECIP.NAME RECIPIENT AFFILIATION ENGELKENR.H.
Region 5, San Francisco, Office of-the Directo~r
SUBJECT:
RO:on 800922,while decontaminating steam generator channel heads'decontamination sys was shut down due to excess makeup in sys.Examination of seal revealed 10-inch tear in rubber ballon resulting in seal failure.Cause under review.,
DISTRIBUTION CODE: A002S COPIES RECELVED:LTR.
ENCL:
SIZE:4 TITLE: Incident Reports NOTES:1 copy:SEP Sect.,Ldr..
05000206 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME.
L-TTR ENCL ACTION:
CRUTCHFIELD 04 3
INTERNAL: A/D COMP&STRU06
- 1.
A/D ENV TECH 07 1
A/D MATL & QU08 1
A/D OP REACTOO9 I
A/D PLANT SYS1O 1
A/D RAD PROT 11
- 1.
A/D SFTY ASSE12 1
A/D TECHNOLOG13 1
ACC EVAL BR 14 1
AEOD 2
ASLBP/J.HARD 1
AUX SYS BR 15 1
CHEM ENG BR 16 1
CONT SYS BR 17 1
CORE PERF BR 18 1
D/DIRHUM FAC19 1
DIRENGINEERI20 1
DIRHUM FACIS21 1
DIRSYS INTEG22 1
EFF TR SYS BR23 1
EQUIP QUAL BR25 1
GEOSCIENCES 26 1
I&C SYS BR.
29 1
I&Ei 05 2
JORDANE!./IE 1
LIC GUID BR 30 1
1 LIC QUAL BR
- 31.
1 MATL ENG BR, 32 1
1 MECH ENG BR 33 1
MPA 3
NRC PDR 02 1
OP EX EVAL BR34 3
3 OR ASSESS BR 35 1
POWER SYS BR 36 1
1 ESS BR39 1
REACT'SYS BR,40 1
1 01 1
REL & RISK A 41 1
- 1.
SF PROG EVA42 1
STRUCT ENG BR44 1
1 SYS INTERAC 845 1
EXTERNAL: ACRS 46 16 1
LPDR 03 1
1 NSIC 05 1
TERA:DOUG MAY 1
1 00 TOTAL NUMBER OF COPIES REQUIRED: LTTR 0'f ENCL 6*
Southtern Ca(/forn/ao d&a o in p,
~
d 1 jIri September.49 1 06 tJS.lUCleakr Regul atorY COyMMIt i i h Off ice of Inspection anad Enforcement,.r fR9ion V 1990 Horth California boulevard Sulte 2021 Walnut Creek Plai6 Walnut Creek, California 94596 Attention:. INrj Rt H. Ergiekeh, Director DOCKET 7~.$-0 SAf ONOWR 011J I D)ear Sir.'
This letter describes A r-eporta bl occrence tnvovn n
advertent dilution of the, reactor-coolant stei'*-. SUbihit1 ii in iacerda1nce with the reporting requlrepuents r,'tjoulbtod 1:tnetc i
of Appendix A. to the Provisiona IOpera ting L Icense6 I(WR On September 22 1980 Work was tunderokY to deotamnt h t generator channel heods,!" order to toiniMize men-rem during twe itiidi gnerator sleeving rpi rga.Te decontAmination orocessts higih pressure grit spray-t* reaove the om~dt lAer from thb iteam*
qdferator channel head.
In order to prevent the wtr-oed sprAy from enterinq tfi r-e*ctbj coolant system, Inflatable plugs vier*4 installed, in order t6, on'itbr for leakage patth lusth owtng Itm iri tontiousllly m66itred:.
10 Inflatable teal pressure.
D. econtamnation system wAter inventory.
3i Reactor vessel l1evel
- 4. Volume control taok ievel
~. boront concentration (samptes A i4 ta ke n 6nce hbur ciArin.g dotont~inAmtion operation)
At 2145 the decontaminatoll
$yt~ Wa S S'6A dowi du6 twxo cs
~~
akeup in the decontfamination 'syom A bron ahslys Sat 215 Indicat at dilution of 51 ppm had occurred. Th* loop sea) Was 6xamined and f ouWnd to have failed. A seal pressure change wak hot observed be*cause the gauge quick disconnect was not.-properly connected,, isolating both the gauge Mnd
/ (
Sealx air supply.
Examination of the seal found a 10'" tear-in the rubber ballon resulting in sea falue Th 1cAt Ias - f th -e n syt fgailure is still Under invyesti ati.4 8*00)60 a 66
U., S.luclear Iegulatory cowitS~O6 Page #2 Ifie dilution in boron concenitratio6 ot so ppm reprse 6 reai AY Addition in excess of the $04 prompt reportino req-uirments' of Section 69,2.4 of the Technical Spec ftf kationst The inadverteit dili Oclird during a time when contairoent intovrity iW6a not estiblishedaseqrd by Section 3.6.B83 of the Technica Specifications.l At Inoi timek Mi boron concentration decrease belo 240oppi Whh rpresents qa 6 090.
66eC106 taminatlon of the $team generators has been ditconitifiUed'Iil repafri ha~ve been completed, and correctiv, action tob prevenit ii treoccarrahC6 66"w pleted.
A complet reporL 06 hit, te r 9'geher Wit rpthiwt a Oticee toent Retport wi I be forvorded wIthin 14 day$';
Plant Manager J1TR/ap