ML13316B375

From kanterella
Jump to navigation Jump to search
Notice of Issuance of Amend 127 to License DPR-13.Amend Provides for Reactor Vessel Thermal Shield Monitoring Program & mid-cycle Insp Until Thermal Shield Fasteners Repaired During Fuel Cycle XI Refueling & 10-yr ASME Insp
ML13316B375
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 05/15/1989
From: Trammell C
Office of Nuclear Reactor Regulation
To:
Shared Package
ML13316B371 List:
References
NUDOCS 8905220212
Download: ML13316B375 (2)


Text

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION SOUTHERN CALIFORNIA EDISON COMPANY, ET AL.

DOCKET NO. 50-206 NOTICE OF ISSUANCE-OF ANENDMENT.TO PROVISIONAL OPERATING LICENSE The U.S. Nuclear Regulatory Commission (Commission) has issued Amendment No.127to Provisional Operating License No. DPR-13, issued to Southern California Edison Company and San Diego Gas and Electric Company (the licensees), for operation of the San Onofre Nuclear Generating Station, Unit No. 1, located in San Diego County, California. The amendment was effective as of the date of issuance.

The amendment provides for a reactor vessel thermal shield monitoring pro gram and mid-cycle inspection until the thermal shield fasteners are repaired during the fuel cycle XI refueling and 10-year ASME Inservice Inspection.

The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations. The Commission has made appropriate findings as required by the Act and the Commission's regulations in 10 CFR Chapter 1, which are set forth in the license amendment.

Notice of Consideration of Issuance of Amendment and Opportunity for Hearing in connection with this action was published in the FEDERAL REGISTER on March 2, 1989 (54 FR 8854).

No request for a hearing or petitions for leave to intervene were received. Subsequent to issuance of this notice, the licensees provided supplemental information by letters dated March 21 and 23 and May 3 and 8, 1989. These letters provided additional information and revised cummitments encompassed by the original notice.

890t5220212 890515 PDR ADOCK 050002, 6 P

PDC

-2 The Commission has prepared an Environmental Assessment related to this action and has concluded that an environmental impact statement need not be prepared because operation of the facility in accordance with this amendment will have no significant adverse effect on the quality of the human environment.

For further details with respect to the action see (1) the application for amendment dated February 17, 1989, as supplemented March 21 and 23 and May 3 and 8, 1989, (2) Amendment No.127to License No. DPR-13, (3) the Commission's related Safety Evaluation and (4) the Commission's Environmental Assessment. All of these items are available for public inspection at the Commission's Public Document Room, 2120 L Street NW., Washington, DC 20555, and at the General Library, University of California, P.O. Box 19557, Irvine, California 92713. A copy of items (2), (3) and (4) may be obtained upon request addressed to the U.S. Nuclear Regulatory Commission, Washington, DC 20555, Attention:

Director, Division of Reactor Projects -

III, IV, V and Special Projects.

Dated at Rockville, Maryland this 15 day of May, 1989.

FOR THE NUCLEAR REGULATORY COMMISSION Charles M. Trammell, Senior Project Manager Project Directorate V Division of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation