ML13316B326

From kanterella
Jump to navigation Jump to search
Notice of Issuance of Amend 122 to License DPR-13.Amend Approves Safety Analysis for Increase in Steam Generator Tube Plugging from 15% to 20%,including Reanalysis of LOCA & Reactor Coolant Pump Locked Rotor & Shaft Break
ML13316B326
Person / Time
Site: San Onofre 
Issue date: 04/14/1989
From: Trammell C
Office of Nuclear Reactor Regulation
To:
Shared Package
ML13316B323 List:
References
NUDOCS 8904280293
Download: ML13316B326 (2)


Text

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION SOUTHERN CALIFORNIA EDISON COMPANY, ET AL.

DOCKET NO. 50-206 NOTICE OF ISSUANCE OF AMENDMENT TO PROVISIONAL OPERATING LICENSE The U.S. Nuclear Regulatory Commission (Commission) has issued Amendment No. 122 to Provisional Operating License No. DPR-13, issued to Southern California Edison Company and San Diego Gas and Electric Company (the Licensee),

which revised the Technical Specifications for operation of the San Onofre Nuclear Generating Station, Unit No. 1, located in San Diego County, California.

The amendment was effective as of the date of issuance.

The amendment approves the revised safety analysis for (1) an increase in steam generator tube plugging from 15% to 20%, including reanalysis of a Loss-of-Coolant-Accident, (2) the reactor coolant pump locked rotor and shaft break, and (3) an additional time delay and revised boron concentration in the safety injection lines.

The application for the amendment complies with the standards and require ments of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations. The Commission has made appropriate findings as required by the A ct and the Commission's regulations in 10 CFR Chapter 1, which are set forth in the license amendment.

Notice of Consideration of Issuance of Amendment and Opportunity for Hearing in connection with this action was published in the FEDERAL REGISTER on January 23, 1989 (54 FR 31 9).

No request for a hearing or petition for leave to intervene was filed following this notice.

50--0 I

'904280293-89-i0414

.CONSTRUCTION PERMIT & LICENSE CE DR ADOCK 050000,s 6 JAN 1989 thru 3ES F 'D C Y

?

-2 The Commission has prepared an Environmental Assessment related to this action and has concluded that an environmental impact statement need not be prepared because operation of the facility in accordance with this amendment will have no significant adverse effect on the quality of the human environment.

For further details with respect to the action see (1) the application for amendment dated January 11, 1989, as supplemented January 27, March 4 and 11, and April 1, 1989, ( ) Amendment No. 122 to License No. DPR-13, (3) the Commission's related Safety Evaluation and (4) the Commission's Environmental Assessment. All of these items are available for public inspection at the Commission's Public Document Room, 2120 L Street, NW., Washington, DC 20555, and at the General Library, University of California, P.O. Box 19557, Irvine, California 92713. A copy of items (2), (3) and (4) may be obtained upon request addressed to the U.S. Nuclear Regulatory Commission, Washington, DC 20555, Attention: Director: Director, Division of Reactor Projects -

III, IV, V and Special Projects.

Dated at Rockville, Maryland this 14th day of April, 1989.

FOR THE NUCLEAR REGULATORY COMMISSION Charles M. Trammell, Senior Project Manager Project Directorate V Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation