ML13316A307
| ML13316A307 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 08/12/1998 |
| From: | Gibson G Southern California Edison Co |
| To: | NRC/IRM |
| Shared Package | |
| ML13316A308 | List: |
| References | |
| NUDOCS 9808180302 | |
| Download: ML13316A307 (1) | |
Text
SOUTHERN CALIFORNIA EDI SON An EDISON INTERNATIONALs" Company August 12, 1998 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:
Subject:
Docket Nos. 50-206, 50-361, and 50-362 Emergency Plan Implementing Procedures San Onofre Nuclear Generating Station, Units 1, 2 and 3 Pursuant to 10 CFR 50, Appendix E, Section V, this letter provides a copy of the following revised Emergency Plan Implementing Procedures:
PROCEDURE REV EC TITLE SO123-VIII-0.100 3
Maintenance and Control of Emergency Planning Documents SO123-VIII-0.201 8
8-1 Emergency Plan Equipment Surveillance Program SO123-VIII-30.5 8
8-1 Shift Communicator Duties For your convenience, an updated index is enclosed listing titles, latest revisions, and temporary change notices (TCNs)/editorial comments (EC) to all of the San Onofre Nuclear Generating Station Emergency Plan Implementing Procedures. Items which have changed since our last submittal are indicated by a bar in the right margin.
The enclosure also lists the current Offsite Emergency Planning Order and the Emergency Plan Training Program Description, which are referenced in the Emergency Plan.
Sincerely, 9808180302 980812 Gregory T. Gibson
-PDR ADOCK 05000206 0'Geoy
.Gbo P-PD0 Manager, Compliance Enclosures cc:
Emergency Response Coordinator, USNRC Region IV (2 copies)
J. A. Sloan, Senior Resident Inspector, San Onofre Units 2 & 3 P. 0. Box 128 San Clemente, CA 92674-0128