Submits Response to GL 98-01, Yr 2000 Readiness of Computer Systems at Npps. Licensee Has Pursued & Is Continuing to Pursue Yr 2000 Readiness Program Similiar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Yr 2000 Readiness
ML13316A306
Person / Time
Site: San Onofre  
Issue date: 08/07/1998
From: Rainsberry J
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-98-01, GL-98-1, NUDOCS 9808120217
Download: ML13316A306 (2)


Text

SOUTHERN CALIFORNIA S. L. Rainsberry Manager, Plant Licensing An EDISON INTERNATIONAL" Company August 7, 1998 U.S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D.C. 20555 Gentlemen:

SUBJECT:

Docket Nos. 50-206, 50-361, and 50-362 Response to Generic Letter 98-01, "Year 2000 Readiness of Computer Systems at Nuclear Power Plants" San Onofre Nuclear Generating Station, Units 1, 2, and 3

Reference:

Generic Letter 98-01, "Year 2000 Readiness of Computer Systems at Nuclear Power Plants," issued May 11, 1998.

This letter provides Southern California Edison's (SCE's) response to Requirement 1 of Generic Letter (GL) 98-01, "Year 2000 Readiness of Computer Systems at Nuclear Power Plants," for San Onofre Nuclear Generating Station, Units 2 and 3. GL 98-01 is not applicable to Unit 1 because Unit 1 has permanently ceased operations and SCE has certified that fuel has been permanently removed from the reactor.

Requirement 1 of GL 98-01 states that:

"Within 90 days of the date of this generic letter, submit a written response indicating whether or not you have pursued and are.continuing to pursue a Y2K program such as, or similar to, that outlined in NEI/NUSMG 97-07, augmented appropriately in the areas of risk management, contingency planning, and remediation of embedded systems. If your program significantly differs from the NEI/NUSMG guidance, present a brief description of the programs that have already been completed, are being conducted, or are planned to ensure Y2K readiness of the computer systems at your facility(ies). This response must address the program's scope, assessment process, plans for corrective actions (including testing and schedules), QA measures, contingency plans, and regulatory compliance."

oocl. SCE has pursued and is continuing to pursue a year 2000 readiness program similar to that outlined in Nuclear Utility Year 2000 Readiness, NEI/NUSMG 97-07. The program addresses potential year 2000 problems that impact safety 1,zc related systems and other systems required by nuclear power plant license or NRC D.,,regulations. The facility program includes identifying and, where appropriate, rd remediating embedded systems. The program provides for risk management efforts 00 and the development of contingency plans prior to critical dates.

CDC San Onofre Nuclear Generating Station 00t" P. O. Box 128 San Clemente, CA 92674-0128 714-368-7420 c1 M

Document Control Desk*

-2 Requirement 2 of GL 98-01 states:

,"Upon.completing your Y2K program or, in any event, no later than July 1, 1999, submit a written response confirming that your facility is Y2K ready, or will be Y2K ready, by the year 2000 with regard to compliance with the terms and conditions of your license(s) and NRC regulations. If your program is incomplete as of that date, your response must contain a status report, including completion schedules, of work remaining to be done to confirm your facility is/will be Y2K ready by the year 2000."

SCE's response to Requirement 2 will be submitted by July 1, 1999.

If you have any further questions on this subject, please call me.

Sincerely, State of California out f Sa D' o On f S 1

before me, f

f --, personally appeared

4.

a (4

Af Ar

-, personally known to me to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executed the instrument.

WITNESS my nd and official sea

-coMM.oIaEs Notary Public -

California Signatur.

W cc:

E. W. Merschoff, Regional Administrator, NRC Region IV L. L. Wheeler, NRC Project Manager, San Onofre Unit 1 J. W. Clifford, NRC Project Manager, San Onofre Units 2 and 3 D. B. Spitzberg, Regional Project Inspector, San Onofre Unit 1 J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 & 3