Forwards Safety Evaluation Re QA Program Description Change for Plant
ML13316A277
Person / Time
Site: San Onofre  
Issue date: 03/27/1998
From: Larry Wheeler
NRC (Affiliation Not Assigned)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13316A278 List:
References
TAC-MA0981, TAC-MA0982, TAC-MA1002, TAC-MA981, TAC-MA982, NUDOCS 9803310345
Download: ML13316A277 (3)


Text

March 27, 8

Mr. Harold B. Ray Senior Vice President Southern California Edison Co.

San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, California 92674-0128

SUBJECT:

APPROVAL OF CHANGES TO THE QUALITY ASSURANCE PROGRAM DESCRIPTION FOR SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 1, 2 AND 3 (TAC NOS. MA1002, MA0981 AND MA0982)

Dear Mr. Ray:

By letter dated February 6, 1998, Southern California Edison (SCE) transmitted Change Notice 43 to the SCE Quality Assurance Topical Report SCE-1-A Amendment 19 dated December 1997, in accordance with 10 CFR 50.54(a). This revision identifies an alternative to previously approved provisions for lead auditor qualifications.

The staff has reviewed the submittal in accordance with 50.54(a) and determined that the proposed change to the quality assurance program is acceptable providing that the additional proposed quality assurance program controls are implemented to properly evaluate the demonstrated abilities of the prospective lead auditors. The quality assurance program continues to meet the requirements of Appendix B to 10 CFR Part 50 and meets the additional requirements of 50.34(b)(6)(ii) by discussing how the applicable requirements of Appendix B will be satisfied. The effectiveness of SCE's quality assurance program implementation will continue to be the subject of routine NRC inspections. The staff's safety evaluation is provided in the enclosure to this letter.

If there are changes to other previously agreed to and docketed commitments outside the quality assurance program description, SCE is obligated to revise those commitments in accordance with the governing change control process and notify the NRC as appropriate.

Sincerely, ORIGINAL SIGNED BY:

Louis L. Wheeler, Senior Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket Nos. 50-206, 50-361, and 50-362

Enclosure:

Safety Evaluation cc w/enclosure: See next page DISTRIBUTION:

HARD COPY E-MAIL COPY Docket File 50-206/361/362 RSmith RBurrows AMarkley PUBLIC OGC RDudley JMinns PDND r/f EHylton MFairtile LThonus JRoe DWheeler TFredrichs MWebb MMasnik i C MFields PHarris EPeyton PM P

LA PDND:(A)S P

eler on MMasnik SWeiss 3/fl98 31 /98 3/1,198 3/27/98 OFFICIAL RECORD COPY?

DOCUMENT NAME: G:\\SECY\\WHEELER\\L-RAY 9803310345 980327 PDR ADOCK 05000206 P

PDR

____~~C P

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 27, 1998 Mr. Harold B. Ray Senior Vice President Southern California Edison Co.

San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, California 92674-0128

SUBJECT:

APPROVAL OF CHANGES TO THE QUALITY ASSURANCE PROGRAM DESCRIPTION FOR SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 1, 2 AND 3 (TAC NOS. MA1002, MA0981 AND MA0982)

Dear Mr. Ray:

By letter dated February 6, 1998, Southern California Edison (SCE) transmitted Change Notice 43 to the SCE Ouality Assurance Topical Report SCE-1-A Amendment 19 dated December 1997, in accordance with 10 CFR 50.54(a). This revision identifies an alternative to previously approved provisions for lead auditor qualifications.

The staff has reviewed the submittal in accordance with 50.54(a) and determined that the proposed change to the quality assurance program is acceptable providing that the additional proposed quality assurance program controls are implemented to properly evaluate the demonstrated abilities of the prospective lead auditors. The quality assurance program continues to meet the requirements of Appendix B to 10 CFR Part 50 and meets the additional requirements of 50.34(b)(6)(ii) by discussing how the applicable requirements of Appendix B will be satisfied. The effectiveness of SCE's quality assurance program implementation will continue to be the subject of routine NRC inspections. The staff's safety evaluation is provided in the enclosure to this letter.

If there are changes to other previously agreed to and docketed commitments outside the quality assurance program description, SCE is obligated to revise those commitments in accordance with the governing change control process and notify the NRC as appropriate.

Sincerely, Louis L. W eel r, Senior Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket Nos. 50-206, 50-361, and 50-362

Enclosure:

Safety Evaluation cc w/enclosure: See next page

Mr. Harold B. Ray San Onofre Nuclear Generating Southern California Edison Company Station, Units 1, 2, and 3 Docket Nos. 50-206/361/362 cc:

Mr. R. W. Krieger, Vice President Alan R. Watts, Esq.

Southern California Edison Company Woodruff, Spradlin & Smart San Onofre Nuclear Generating Station 701 S. Parker St. No. 7000 P. O. Box 128 Orange, California 92668-4702 San Clemente, California 92674-0128 Mr. Sherwin Harris Mr. Richard Krumvieda Resource Project Manager Manager, Nuclear Department Public Utilities Department San Diego Gas & Electric Company City of Riverside P. 0. Box 1831 3900 Main Street San Diego, California 92112 Riverside, California 92522 Resident Inspector/San Onofre NPS Mr. Terry Winter clo U.S. Nuclear Regulatory Commission Manager, Power Operations P. 0. Box 4329 San Diego Gas & Electric Company San Clemente, California 92674 P.O. Box 1831 San Diego,. California 92112-4150 Mayor City of San Clemente Mr. Dwight E. Nunn, Vice President 100 Avenida Presidio Southern California Edison Company San Clemente, California 92672 San Onofre Nuclear Generating Station P.O. Box 128 Chairman, Board of Supervisors San Clemente, California 92674-0128 County of San Diego 1600 Pacific Highway, Room 335 San Diego, California 92101 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services P. 0. Box 942732 Sacramento, California 94234 Dr. Harvey Collins, Chief Division of Drinking Water and Environmental Management P. 0. Box 942732 Sacramento, California 94234-7320