January 7, 1998 Mr. Harold B. Ray Senior Vice President Southern California Edison Co.
San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, California 92674-0128
SUBJECT:
SAN ONOFRE UNIT 1 - NRC PROJECT MANAGEMENT
Dear Mr. Ray:
On December 29, 1997, Mr. Louis L. Wheeler assumed project management responsibilities for San Onofre Unit 1. His previous assignment was with Project Directorate 11-2, DRPE, as the NRR Project Manager for the Vogtle Electric Generating Plant operated by Southern Nuclear Operating Company. Mr. Wheeler can be contacted at (301) 415-1444, or via E-mail at dxw@nrc.gov.
Sincerely,
,Original signed by:
Seymour H. Weiss, Director Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-206 cc: See next page DISTRIBUTION: E-MAIL HARD COPY MFairtile RDudley Docket File 50-206 SWeiss LThonus TFredrichs PUBLIC MMasnik JHickey PHarris PDND r/f OGC (015-B18)
RBurrows AMarkley JRoe Region IV MWebb JMinns LWheeler EHylton PDND:PM PDND:LA PDND:(A)SC PDND:D LWheeler EHylton MMasnik 1 SWeiss OFFICIAL RECORD COPY DDOCUMENT NAME: G:\\SECY\\WHEELER\\SANONOFR.LW 9a1140154 9810107 POR A1DCK1 52061 11111111111111111111 11111111I11 Q
8 8
3 C
C 2*
C.ERREG(,
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20455-OoI January 7, 1998 Mr. Harold B. Ray Senior Vice President Southern California Edison Co.
San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, California 92674-0128
SUBJECT:
SAN ONOFRE UNIT 1 - NRC PROJECT MANAGEMENT
Dear Mr. Ray:
On December 29, 1997, Mr. Louis L. Wheeler assumed project management responsibilities for San Onofre Unit 1. His previous assignment was with Project Directorate 11-2, DRPE, as the NRR Project Manager for the Vogtle Electric Generating Plant operated by Southern Nuclear Operating Company. Mr. Wheeler can be contacted at (301) 415-1444, or via E-mail at dxw@nrc.gov.
Sincerely, Seymour H. Weiss, Director Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-206 cc: See next page
Mr. Harold B. Ray San Onofre Nuclear Generating Southern California Edison Company Station, Unit 1 Docket No. 50-206 cc:
Mr. R. W. Krieger, Vice President Southern California Edison Company San Onofre Nuclear Generating Station P. 0. Box 128 San Clemente, California 92674-0128 Mr. Richard Krumvieda Manager, Nuclear Department San Diego Gas & Electric Company P. O. Box 1831 San Diego, California 92112 Resident Inspector/San Onofre NPS C/o U.S. Nuclear Regulatory Commission P.
- 0. Box 4329 San Clemente, California 92674 Mayor City of San Clemente 100 Avenida Presidio San Clemente, California 92672 Chairman, Board of Supervisors County of San Diego 1600 Pacific Highway, Room 335 San Diego, California 92101 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services P. 0. Box 942732 Sacramento, California 94234 Dr. Harvey Collins, Chief Division of Drinking Water and Environmental Management P. 0. Box 942732 Sacramento, CA 94234-7320