HSOUERN CALIFORNIA SL. Rainsberry Manager Plant Licensing An EDISON INTER.\\ATIOkiL Cimpany December 24, 1997 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Gentlemen:
Subject:
Docket Nos. 50-206, 50-361, and 50-362 Postponement of Ingestion Pathway Zone Emergency Plan Exercise San Onofre Nuclear Generating Station Units 1, 2 and 3 This letter documents the schedule change for the Ingestion Pathway Zone (IPZ) exercise, which was discussed during a recent telephone conversation with Mr. Blaine Murray (NRC, Region IV).
The IPZ exercise originally planned for 1997 at the San Onofre Nuclear Generating Station (SONGS) is now scheduled to occur in 1999. This new schedule is an exception to the SONGS Emergency Plan, Section 8.1.3.1, which requires that "all major elements of the plan and the emergency organization are tested within a six-year period."
The IPZ exercise was postponed at the request of Mr. Eugene Bates of the NRC Region IV office to facilitate NRC participation. This request for postponement was agreed upon by Mr. Ben Tong, of the California Governor's Office of Emergency Services, who holds this scheduling authority for the State of California.
This exercise was last conducted in 1991.
If you have any questions or require additional information, please do not hesitate to contact me.
Very truly yours, for J. L. Rainsberry 9801020073 971224 PDR ADOCK 05000206 F
PDR cc:
E. W. Merschoff, Regional Administrator, NRC Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV M. K. Webb, NRC Project Manager, San Onofre Unit 1 San Onofre Nuclear Generating Station P. 0.Box 128 S
36-n Clmet.
A 9~7-O 111111111111111111 11111 P l111111111111i 1ll a
3 Q 1 9
Document Control Desk December 24, 1997 M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 L. C. Carson, Regional Project Inspector, San Onofre Unit 1 J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 & 3 S. S. Bajwa, Section Chief, Decommissioning Section E. F. Bates, Inspector, NRC Region IV T. H. Andrews, Inspector, NRC Region IV bcc:
(See attached sheet)