Southern California Edison Company 23 PARKER STREET IRVINE. CALIFORNIA 92718 R.M.ROSENBLUM TELEPHONE MANAGER OF (714)587-5420 NUCLEAR REGULATORY AFFAIRS June 27, 1990 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Gentlemen:
Subject:
Docket No. 50-206 Additional Information Regarding Reply to a Notice of Violation San Onofre Nuclear Generating Station Unit 1
Reference:
A) Letter, Mr. B. H. Faulkenberry, NRC to Mr. Harold B. Ray, SCE, dated December 26, 1989 B) Letter, Harold B. Ray, SCE, to NRC, dated January 25, 1990 We are in the process of completing our review of an amendment application that is being prepared, in part, in response to a Notice of Violation (NOV)
(Reference A).
The proposed amendment is a comprehensive change to the Technical Specifications for the safety injection system. We expected to submit the amendment by June 30, 1990; however, the many changes included in the submittal have required extending the review process beyond that normally needed. The proposed amendment is expected to be submitted by August 31, 1990.
Many changes have been necessary to revise the existing Technical Specifications to follow the guidance of the Standard Technical Specifications (STS), and to incorporate numerous design basis requirements. We are following the format and guidance of the STS as much as practical for preparation of this change. However, since SONGS 1 has a unique system configuration with shared components and flow paths, the application of the STS is not straight forward and additional information beyond that normally required by the STS is being added. The additional information being added to the proposed Technical Specification is requiring a more thorough review of this change.
The proposed amendment will revise the existing requirements for safety injection system operation to include specific requirements for the operation of the recirculation system, as commited to in our previous response (Reference B).
This will remove the potential for misinterpretation of the Technical Specifications that led to the NOV (Reference A).
In the interim period, until the proposed Technical Specifications are issued, we have emplaced administrative controls which clarify that the existing specifications apply to the recirculation portions of the safety injection system.
9006290032 90062-7 PDR ADOCK 05000206 0F PDC
Document Control Desk
-2 Our need to change the submittal date was discussed with Mr. Chris Caldwell and Mr. Phil Morrill of Region V on June 25, 1990. If you have any questions or require additional information, please contact me.
Sincerely, cc:
J. B. Martin, Regional Administrator, NRC Region V C. Caldwell, NRC Senior Resident Inspector, San Onofre Units 1, 2 and 3