Part 21 Rept Re Drum Brake on Retrofit Crane Trolley Not Setting After drive-train Failure.Caused by Improper Design of Slide.Slide Replaced W/New Design Which Prevents Jamming of Mechanism.Instructions Sent to Utils
ML13316A048
Person / Time
Site: Point Beach, Duane Arnold, San Onofre  
Issue date: 04/03/1990
From: Thomas A
EDERER, INC.
To: Murley T
Office of Nuclear Reactor Regulation
References
REF-PT21-90-051-000 PT21-90-051-000, NUDOCS 9004200184
Download: ML13316A048 (3)


Text

EDERER INCORPORATED W CRANES Via: Certified Mail April 3, 1990 STAR SCRANES Office of Nuclear Reactor Regulation Nuclear Regulatory Commission Washington D.C. 20555 Attn: Mr. Thomas Murly, Director (3 copies)

Dear Sir:

On the afternoon of March 30,

1990, we received by facsimile from Southern California Edison Company a copy of an Ederer letter dated April 12, 1985, which describes a problem found during test of an X SAM system in England.

Resolution of this problem resulted in revisions to drawings of a mechanical component called a "Slide."

These revisions occurred between March and August of 1985, and involved Ederer drawings B 15937, B-15938, B-16868, B-16936 and B-16937.

The April 12, 1985 letter also mentioned the X-SAM systems at Wisconsin Electric's Point Beach Plant and at Iowa electric's Duane Arnold Unit 1 plant.

These installations have Slides made prior to March 1985 and no retrofits have been made.

The X-SAM at Iowa Electric was field checked and tested in January 1985.

The Wisconsin installation has both main and auxiliary hoist X-SAM's, and they were field tested in August of 1985.

All had previously passed our in house check-out and tests.

It appears that the successful completion of factory and field tests (without incidence of this problem) for Iowa and Wisconsin led to the conclusion that no further action was warranted, and that the problem was not reportable under 10 CFR 21.

I do not agree with this decision,

however, and therefore have reported this defect by telephone to Mr. Greg Cwalina of the Vendor Inspection Branch on April 3,

1990.

On this date I also notified Wisconsin Electric, Mr.

Bruce Sasman, and Iowa Electric, Mr.

Bruce

Lacy, of this action.

The notifications to Wisconsin and Iowa included instruction to make no critical lifts until the X-SAM systems are retrofitted with Slides of new design.

I am enclosing a copy of the Ederer letter of April 12, 1985, along with our in-house Trouble Reports for the Wisconsin and Iowa installations. Attached to the Trouble Reports are Ederer's 10 CFR 21 Forms 1, 2 and 3 for each.

I note that the original April 12, 1985 9004200184 9)00403 PFDR ADOCK 0500026 FDC I

2925 FIRST AVENUE SOUTH, SEATTLE, WA 98134

  • POST OFFICE BOX 24708, SEATTLE, WA 98124 TEL: (206) 622-4421
  • TWX: 910-444-2211 EDERER SEA
  • ESL: 62840478
  • FAX: (206) 623-8583

e EDERER CRANES W WAINGTON 5STAR page two S CRANES letter was sent to Mr.

Gary Zech at the Office of Inspection and Enforcement, Mr. Mark Murphy at Iowa Electric, and Mr. Roger Newton at Wisconsin Electric.

Yours truly, EDERER INCORPORATED Ashley Thomas Vice President Engineering cc: (via Certified Mail)

Wisconsin Electric Power Company Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241 Attn: Mr. Bruce 0. Sasman cc: (via Certified Mail)

Iowa Electric Light and Power Company Duane Arnold Energy Center 3277 DAEC Road Palo, Iowa 52324 Attn: Mr. Bruce Lacy

3'30'60 15:05

'a714 45 876 ESL/

C 001 TELECOPY AGSSAGE SOUTHERN CALIFORNIA EDISON COMPANY 6on rcLcL TELECOPY TRANSMITTAL TO:

\\Ji-k'sk COMPANY:

EDeegg IAJ TELEPHONE NO:

(owl TELECOPY TELEPHONE NO:

8 TOTAL NO. OF PAGES (including cover sheet):

FROM:

____\\e_

COMPANY:

GogyJER;1 CAM F.

ISA TELEPHONE NO:

7i )

8-54 DISPOSITION OF ORIGINALS: