AEQo UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V 1450 MARIA LANE WALNUT CREEK, CAUFORNIA 94596-5368 FEB 1
Docket Nos. 50-206, 50-361, and 50-362 License Nos. DPR-13, NPF-10, and NPF-15 Southern California Edison Co.
Irvine Operations Center 23 Parker Street Irvine, California 92718 Attention:
Mr. Harold B. Ray Senior Vice President, Power Systems
SUBJECT:
REVIEW OF PROPOSED REVISION 6.0 AND REVISION 5.6 TO THE SAN ONOFRE NUCLEAR GENERATING STATION (SONGS) EMERGENCY PLAN This letter refers to proposed Revision 6.0 and Revision 5.6 to the SONGS Emergency Plan which were submitted to us by letters dated November 5 and December 20, 1993, respectively. Prior NRC approval was requested for proposed Revision 6.0, which incorporated changes resulting from the permanent shutdown of Unit 1. Revision 5.6, which incorporated 10 CFR 20 and EPA-400 terminology changes, was implemented without prior approval in accordance with the provisions of 10 CFR 50.54(q).
We have completed our review of the emergency plan changes and proposed changes. Ms. G. Good discussed the preliminary results of our review during January 25 and 26, 1994, conference calls with Messrs. C. Anderson, M. Zenker, and K. Bellis. Several follow-up calls were held during the period January 27 through February 2, 1994, to obtain additional information about one.of the changes. We also contacted the Federal Emergency Management Agency (FEMA),
Region IX.
Our review indicated that all of the changes in Revision 5.6 and all but one of the proposed changes in Revision 6.0 continued to meet the standards in 10 CFR 50.47(b) and the requirements of Appendix E to Part 50. A proposed change to Section 8.4 of the emergency plan would eliminate the annual frequency for dissemination of public information instructions. The description of this proposed change provided by your staff indicated that this section was being revised to "eliminate the erroneous implication that emergency planning instructional material is distributed annually." We cannot approve this proposed change since yearly dissemination is required by 10 CFR 50, Appendix E, Paragraph IV.D.2. Moreover, this letter calls your attention to the need to follow all of the provisions of your currently approved emergency plan if you are not doing so.
9402230234 940209 PDR ADOCK 05000206 F
PDR A
2 Your practices for disseminating public information instructions will be examined during a future inspection. We consider this issue to be an unresolved item. An unresolved item is a matter about which more information is required to ascertain whether it is an acceptable item, a deviation, or a violation.
All of the other changes were considered acceptable. The changes resulting from the permanent shutdown of Unit 1 were consistent with plant status and did not appear to have a negative effect on existing emergency plan requirements for Units 2/3. During the January 26, 1994, conference call, your staff agreed to correct several relatively minor issues prior to the implementation of Revision 6.0.
The most significant issues involved inconsistencies with 10 CFR 20 and EPA-400 terminology.
Based on the results of our review, and the actions planned by your staff, we approve the changes and proposed changes to your emergency plan with the exception of the proposed change to Section 8.4.
Should you have any questions concerning this review, we will be glad to discuss them with you.
Sincerely, Ross A. Scarano, Director Division of Radiation Safety and Safeguards cc:
Mr. Robert G. Lacy, Manager, Nuclear Department, San Diego Gas & Electric Company Mayor, City of San Clemente.
Chairman, Board of Supervisors, County of San Diego Mr. Steve Hsu, Radiologic Health Branch, State Department of Health Services Mr. Don J. Womeldorf, Chief, Environmental Management Branch, California Department of Health Services Mr. Thomas E. Bostrom, Project Manager, Bechtel Power Corporation Mr. Edwin A. Guiles, Vice President Engineering & Operations, San Diego Gas and Electric Co.
T. E. Oubre, Esq., Southern California Edison Company Mr. Sherwin Harris, Resource Project Manager, Public Utilities Department Mr. Charles B. Brinkman, Manager, ABB Combustion Engineering Nuclear Power Mr. R. W. Krieger, Vice President, Southern California Edison Company Mr. J. Dominguez, FEMA, Region IX bcc:
R. Emch, NRR/PEPB M. Webb. NRR/ONDB R. Huey, RV A. McQueen, RV EP File 4.3.1 RV/gmd
~
~
UEST COPY REQU T COPY REQ COPY SD TO PDR S-kD TO DCS NO YES NO YE ES/NO LYESNO ood RPate RScaran