ML13312A757
| ML13312A757 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 01/20/1994 |
| From: | Pate R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Ray H SOUTHERN CALIFORNIA EDISON CO. |
| Shared Package | |
| ML13312A758 | List: |
| References | |
| NUDOCS 9402230050 | |
| Download: ML13312A757 (3) | |
See also: IR 05000206/1993035
Text
-R
IUNITED
STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1450 MARIA LANE
WALNUT CREEK, CALIFORNIA 94596-5368
JAN 2 0 1994
Docket Nos. 50-206, 50-361, and 50-362
Southern California Edison Company
Irvine Operations Center
23 Parker Street
Irvine, California 92718
Attention:
Mr. Harold B. Ray
Senior Vice President, Nuclear
SUBJECT:
NRC INSPECTION
This letter refers to the inspection conducted by Mr. A. D. McQueen of this
office on December 13-17,
1993, of activities authorized by NRC License Nos.
DPR-13, NPF-10, and NPF-15, and to the discussion of our findings that I
and Mr. McQueen held with members of your staff at the conclusion of the
inspection.
Areas examined during the inspection included activities related to emergency
preparedness as described in the enclosed inspection report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observations by the
inspector.
No violations of NRC requirements were identified within the scope of this
inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be glad to
discuss them with you.
Sincerely,
R bert J. Pa e Chief
Safeguards, Emergency Preparedness, and
Non-Power Reactor Branch
Enclosure:
Inspection Report Nos. 50-206/93-35, 50-361/93-35, and 50-362/93-35
9402230050 940120
ADOCK 05000206
G
eI
cc:
Mr. Robert G. Lacy, Manager, Nuclear Department, San Diego Gas & Electric
Company
Mayor, City of San Clemente
Chairman, Board of Supervisors, County of San Diego
Mr. Steve Hsu, Radiologic Health Branch, State Department of Health Services
Mr. Don J. Womeldorf, Chief, Environmental Management Branch, California
Department of Health Services
Mr. Thomas E. Bostrom, Project Manager, Bechtel Power Corporation
Mr. Edwin A. Guiles, Vice President Engineering & Operations, San Diego Gas
and Electric Co.
T. E. Oubre, Esq., Southern California Edison Company
Mr. Sherwin Harris, Resource Project Manager, Public Utilities Department
Mr. Charles B. Brinkman, Manager, ABB Combustion Engineering Nuclear Power
Mr. R. W. Krieger, Vice President, Southern California Edison Company
J. Dominguez, FEMA, Region IX
JAN 2 0 1994
bcc w/enclosure:
Docket File
Resident Inspector
Project Inspector
G. Kalman, NRR/PD5
M. Fields, NRR/PD5
R. Emch, NRR/PEPB
G. Cook
K. Perkins
C. Vandenburgh
bcc w/o enclosure:
M. Smith
D. Clevenger
Region V/ann
AMcQueen
RPate
1/T /94
REQUEST COPY
REQUEST COPY
REQUEST COPY
REQUEST COPY
YES
g NO O
YESO
NO_0 YES O NO 1 YEs O NOE
SEND TO DCS
SEND TO PDR
YES
NO 0
YESP NOO
22 G&5