Forwards Insp Repts 50-206/93-35,50-361/93-35 & 50-362/93-35 on 931213-17.No Violations Noted
ML13312A757
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 01/20/1994
From: Pate R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13312A758 List:
References
NUDOCS 9402230050
Download: ML13312A757 (3)


See also: IR 05000206/1993035

Text

-R

IUNITED

STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1450 MARIA LANE

WALNUT CREEK, CALIFORNIA 94596-5368

JAN 2 0 1994

Docket Nos. 50-206, 50-361, and 50-362

Southern California Edison Company

Irvine Operations Center

23 Parker Street

Irvine, California 92718

Attention:

Mr. Harold B. Ray

Senior Vice President, Nuclear

SUBJECT:

NRC INSPECTION

This letter refers to the inspection conducted by Mr. A. D. McQueen of this

office on December 13-17,

1993, of activities authorized by NRC License Nos.

DPR-13, NPF-10, and NPF-15, and to the discussion of our findings that I

and Mr. McQueen held with members of your staff at the conclusion of the

inspection.

Areas examined during the inspection included activities related to emergency

preparedness as described in the enclosed inspection report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observations by the

inspector.

No violations of NRC requirements were identified within the scope of this

inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

Sincerely,

R bert J. Pa e Chief

Safeguards, Emergency Preparedness, and

Non-Power Reactor Branch

Enclosure:

Inspection Report Nos. 50-206/93-35, 50-361/93-35, and 50-362/93-35

9402230050 940120

PDR

ADOCK 05000206

G

PDR

eI

cc:

Mr. Robert G. Lacy, Manager, Nuclear Department, San Diego Gas & Electric

Company

Mayor, City of San Clemente

Chairman, Board of Supervisors, County of San Diego

Mr. Steve Hsu, Radiologic Health Branch, State Department of Health Services

Mr. Don J. Womeldorf, Chief, Environmental Management Branch, California

Department of Health Services

Mr. Thomas E. Bostrom, Project Manager, Bechtel Power Corporation

Mr. Edwin A. Guiles, Vice President Engineering & Operations, San Diego Gas

and Electric Co.

T. E. Oubre, Esq., Southern California Edison Company

Mr. Sherwin Harris, Resource Project Manager, Public Utilities Department

Mr. Charles B. Brinkman, Manager, ABB Combustion Engineering Nuclear Power

Mr. R. W. Krieger, Vice President, Southern California Edison Company

J. Dominguez, FEMA, Region IX

JAN 2 0 1994

bcc w/enclosure:

Docket File

Resident Inspector

Project Inspector

G. Kalman, NRR/PD5

M. Fields, NRR/PD5

R. Emch, NRR/PEPB

G. Cook

K. Perkins

C. Vandenburgh

bcc w/o enclosure:

M. Smith

D. Clevenger

Region V/ann

AMcQueen

RPate

1/T /94

REQUEST COPY

REQUEST COPY

REQUEST COPY

REQUEST COPY

YES

g NO O

YESO

NO_0 YES O NO 1 YEs O NOE

SEND TO DCS

SEND TO PDR

YES

NO 0

YESP NOO

22 G&5