UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1450 MARIA LANE
WALNUT CREEK, CALIFORNIA 94596-5368
DEC 1 4 193
Docket Nos. 50-206, 50-361, and 50-362
Southern California Edison Company
Irvine Operations Center
23 Parker Street
Irvine, California 92718
Attention:
Mr. Harold B. Ray
Senior Vice President
SUBJECT:
NRC INSPECTION REPORT 50-206/93-28, 50-361/93-28,
AND 50-362/93-28
During the period August 18 through November 22, 1993, Ms. G. Good of this
office conducted an in-office inspection of activities authorized by NRC
License Nos. DPR-13, NPF-10, and NPF-15. At the conclusion of the inspection,
.Ms.
Good discussed our findings with members of your staff identified in the
enclosed report.
The in-office inspection was conducted to review Revision 10, Temporary Change
Notice (TCN) 10-1, and Revision 11 to emergency plan implementing procedure(s)
S01(23)-VIII-1, "Recognition and Classification of Emergencies." These
procedures were submitted in accordance with the provisions of 10 CFR
50.54(q).
Based on the results of this inspection, it appears that one of your
activities was not conducted in full compliance with NRC requirements as
discussed in Section 2 of this report. This violation will not be subject to
enforcement action because your efforts in identifying and correcting the
violation meet the criteria specified in Section VII.B of the Enforcement
Policy.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be glad to
discuss them with you.
Sincerely,
R bert J. Pat,
ief
Safeguards, Emergency Preparedness, and
Non-Power Reactor Branch
9312300069 931214
PDR ADOCK 05000206
0
Enclosure:
Inspection Report Nos. 50-206/93-28, 50-361/93-28, and 50-362/93-28
Attachment as Stated
cc w/enclosures:
Mr. Robert G. Lacy, Manager, Nuclear Department, San Diego Gas & Electric
Company
Mayor, City of San Clemente
Chairman, Board of Supervisors, County of San Diego
Mr. Steve Hsu, Radiologic Health Branch, State Department of Health Services
Mr. Don J. Womeldorf, Chief, Environmental Management Branch, California
Department of Health Services
Mr. Thomas E. Bostrom, Project Manager, Bechtel Power Corporation
Mr. Edwin A. Guiles, Vice President Engineering & Operations, San Diego Gas
and Electric Co.
T. E. Oubre, Esq., Southern California Edison Company
Mr. Sherwin Harris, Resource Project Manager, Public Utilities Department
Mr. Charles B. Brinkman, Manager, ABB Combustion Engineering Nuclear Power
Mr. R. W. Krieger, Vice President, Southern California Edison Company
Mr. J. Dominguez, FEMA, Region IX
0II
Southern California Edison Company
Inspection Report Nos. 50-206/93-28, 50-361/93-28, and 50-362/93-28
bcc w/enclosures:
Docket File
Resident Inspector
Project Inspector
A. McQueen
G. Cook
B. Faulkenberry
R. Erickson, NRR/PEPB
bcc w/o enclosures:
M. Smith
D. Clevenger
Region V/ann
GGood
r
RHue
RMJ~EST COPY]
REQUEST
]
ST COPY]
TO DCS]
TO PDR]
__OJ
YES
NO 1
NO 1
ES)
NO 1
ES/
NO
OII