Forwards Insp Repts 50-206/93-28,50-361/93-28 & 50-362/93-28 on 930818-1122.Violation Noted.Violation Will Not Be Subj to Enforcement Action Since Util Made Efforts to Identify & Correct Violation
ML13312A737
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 12/14/1993
From: Pate R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13312A738 List:
References
NUDOCS 9312300069
Download: ML13312A737 (3)


See also: IR 05000206/1993028

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1450 MARIA LANE

WALNUT CREEK, CALIFORNIA 94596-5368

DEC 1 4 193

Docket Nos. 50-206, 50-361, and 50-362

Southern California Edison Company

Irvine Operations Center

23 Parker Street

Irvine, California 92718

Attention:

Mr. Harold B. Ray

Senior Vice President

SUBJECT:

NRC INSPECTION REPORT 50-206/93-28, 50-361/93-28,

AND 50-362/93-28

During the period August 18 through November 22, 1993, Ms. G. Good of this

office conducted an in-office inspection of activities authorized by NRC

License Nos. DPR-13, NPF-10, and NPF-15. At the conclusion of the inspection,

.Ms.

Good discussed our findings with members of your staff identified in the

enclosed report.

The in-office inspection was conducted to review Revision 10, Temporary Change

Notice (TCN) 10-1, and Revision 11 to emergency plan implementing procedure(s)

S01(23)-VIII-1, "Recognition and Classification of Emergencies." These

procedures were submitted in accordance with the provisions of 10 CFR

50.54(q).

Based on the results of this inspection, it appears that one of your

activities was not conducted in full compliance with NRC requirements as

discussed in Section 2 of this report. This violation will not be subject to

enforcement action because your efforts in identifying and correcting the

violation meet the criteria specified in Section VII.B of the Enforcement

Policy.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

Sincerely,

R bert J. Pat,

ief

Safeguards, Emergency Preparedness, and

Non-Power Reactor Branch

9312300069 931214

PDR ADOCK 05000206

0

PDR

Enclosure:

Inspection Report Nos. 50-206/93-28, 50-361/93-28, and 50-362/93-28

Attachment as Stated

cc w/enclosures:

Mr. Robert G. Lacy, Manager, Nuclear Department, San Diego Gas & Electric

Company

Mayor, City of San Clemente

Chairman, Board of Supervisors, County of San Diego

Mr. Steve Hsu, Radiologic Health Branch, State Department of Health Services

Mr. Don J. Womeldorf, Chief, Environmental Management Branch, California

Department of Health Services

Mr. Thomas E. Bostrom, Project Manager, Bechtel Power Corporation

Mr. Edwin A. Guiles, Vice President Engineering & Operations, San Diego Gas

and Electric Co.

T. E. Oubre, Esq., Southern California Edison Company

Mr. Sherwin Harris, Resource Project Manager, Public Utilities Department

Mr. Charles B. Brinkman, Manager, ABB Combustion Engineering Nuclear Power

Mr. R. W. Krieger, Vice President, Southern California Edison Company

Mr. J. Dominguez, FEMA, Region IX

0II

Southern California Edison Company

Inspection Report Nos. 50-206/93-28, 50-361/93-28, and 50-362/93-28

bcc w/enclosures:

Docket File

Resident Inspector

Project Inspector

A. McQueen

G. Cook

B. Faulkenberry

R. Erickson, NRR/PEPB

bcc w/o enclosures:

M. Smith

D. Clevenger

Region V/ann

GGood

r

RP

RHue

RMJ~EST COPY]

REQUEST

]

ST COPY]

TO DCS]

TO PDR]

ES

__OJ

YES

NO 1

ES

NO 1

ES)

NO 1

ES/

NO

OII