ML13312A729

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-206/93-32,50-361/93-32 & 50-362/93-32 on 931101-05.No Violations or Deviations Noted
ML13312A729
Person / Time
Site: San Onofre  
Issue date: 11/22/1993
From: Reese J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Ray H
SOUTHERN NUCLEAR OPERATING CO.
Shared Package
ML13312A730 List:
References
NUDOCS 9312130201
Download: ML13312A729 (3)


See also: IR 05000206/1993032

Text

4, RE(1'

UNITED STATES

1

INUCLEAR

REGULATORY COMMISSION

REGION V

1450 MARIA LANE

WALNUT CREEK, CALIFORNIA 94596-5368

Nov 22 i90

Dockets:

50-206, 50-361, 50-362

Southern California Edison Company

Irvine Operations Center

23 Parker Street

Irvine, California

92718

Attention:

Mr. Harold B. Ray

Senior Vice President, Nuclear

Subject:

NRC INSPECTION OF SAN ONOFRE NUCLEAR GENERATING

STATION, UNITS 1, 2 AND 3 REPORT NOS. 50-206/93-32, 50

361/93-32 AND 50-362/93-32

This refers to the routine inspection conducted by Mr. Louis C.

Carson II of this office on November 1-5, 1993, of the activities

.authorized by NRC License Nos. DPR-13, NPF-10, and NPF-15, and to

the findings discussed with Mr. J. Fee and other members of your

staff identified in the enclosed report.

Areas examined during this inspection are described in the

enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and

representative records, interviews with personnel, and

observations by the inspector.

No violations or deviations were identified during this

inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the

enclosure will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will

be glad to discuss them with you.

S erely

,

J

lit. eee,

ieff

a lities Radiological Protection

Branch

9312130201 931122

PDR ADOCK 05000206

0

PDR

2

Enclosure:

Inspection Report Nos. 50-206/93-32, 50-361/93-32, 50-362/93-32

Mr. Harold B. Ray

Senior Vice President, Nuclear

cc w/enclosures:

Mr. Edwin A. Guiles, Vice President Engineering & Operations, San

Diego Gas and Electric Co.

James A. Beoletto, Esq., Southern California Edison Company

Chairman, Board of Supervisors, County of San Diego

Alan R. Watts,

Esq., Rourke & Woodruff

Mr. Sherwin Harris, Resource Project Manager, Public Utilities

Department

Mr. Charles B. Brinkman, Manager; ABB Combustion Engineering

Nuclear Power

Mr. R. W. Krieger, Vice President, Southern California Edison

Company

Mr. Don J. Womeldorf, Chief, Environmental Management Branch

Mr. Richard J. Kosiba, Project Manager, Bechtel Power Corporation

Mr. Robert G. Lacy, Manager Nuclear Department

Mr. Steve Hsu, Radiologic Health Branch

Mayor, City of San Clemente

3

Inspection Report Nos. 50-206/93-32, 50-361/93-32, 50-362/93-32

Mr. Harold B. Ray

Senior Vice President, Nuclear

bcc w/enclosures:

Docket File

G. Cook

B. Faulkenberry

Resident Inspector

Project Inspector

bcc w/o enclosures:

M. Smith

LCarson AJ

se

[RE .

T COPY] [R

COPY] [SEI'TO DCS ]

[

TO PDR ]

[ ,"YEV

NO

1 f YES

NO

1 f

ES

Oj

NO1iYN