ML13312A721
| ML13312A721 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 09/27/1993 |
| From: | Vandenburgh C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Ray H SOUTHERN CALIFORNIA EDISON CO. |
| Shared Package | |
| ML13312A722 | List: |
| References | |
| NUDOCS 9310260063 | |
| Download: ML13312A721 (5) | |
See also: IR 05000206/1993026
Text
5,
REUNITED
STATES
) p
NUCLEAR REGULATORY COMMISSION
REGION V
1450 MARIA LANE
WALNUT CREEK, CAUFORNIA 94596-5368
SEP 2 7 1993
Docket Nos. 50-206, 50-361, 50-362
Southern California Edison Company
Irvine Operations Center
23 Parker Street
Irvine, California 92718
Attention: Mr. Harold B. Ray, Senior Vice President, Power Systems
SUBJECT: NRC INSPECTION REPORT NOS. 50-206, 361, 362/93-26
This refers to the routine inspection conducted by C. W. Caldwell,
J. J. Russell, D. L. Solorio, and D. F. Kirsch, of this office, and C. M.
Regan, of the Office of Nuclear Reactor Regulation, on July 29 through
September 1, 1993, of activities authorized by NRC License Nos. DPR-13, NPF-10
and NPF-15 and to the discussion of our findings held by the inspectors with
OMr.
R. W. Krieger and other members of the Southern California Edison Company
staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed inspection
report.
Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
No violations of NRC requirements were identified within the scope of this
inspection. However, we were concerned that NRC inspectors identified a
significant hydraulic oil leak on a Unit 2 main feedwater isolation valve that
had not been identified by your staff. If left uncorrected, this leak had the
potential to cause a Unit 2 reactor trip.
Further management attention is
warranted to highten your staff's attention to equipment irregularities as
they conduct plant tours.
We also consider that your efforts in the area of risk management to be a
significant strength. Your efforts to put into place an on-line "risk
monitor" is indicative of your innovative actions and industry leadership in
this area.
We urge you to continue your extensive use of risk assessment
during power operations and refueling outages.
9310260063 930927
ADOCK 05000206
a
-2
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
C. A. VanDenburghhief
Reactor Projects Branch
Enclosure:
Inspection Report Nos. 50-206/93-26
50-361/93-26
and 50-362/93-26
cc w/enclosure:
Mr. Edwin A. Guiles, Vice President Engineering & Operations, San Diego Gas
and Electric Co.
T. E. Oubre, Esq., Southern California Edison Company
Chairman, Board of Supervisors, County of San Diego
Alan R. Watts, Esq., Rourke & Woodruff
Mr. Sherwin Harris, Resource Project Manager, Public Utilities Department
Mr. Charles B. Brinkman, Manager, ABB Combustion Engineering Nuclear Power
Mr. R. W. Krieger, Vice President, Nuclear Generating Station, Southern
California Edison Company
Mr. Don J. Womeldorf, Chief, Environmental Management Branch
Mr. Thomas E. Bostrom, Project Manager, Bechtel Power Corporation
Mr. Robert G. Lacy, San Diego Gas and Electric
Mr. Steve Hsu, Radiologic Health Branch
Mayor, City of San Clemente
3
bcc w/enclosure:
Project Inspector
Resident Inspector
Docket File
G. Cook
S. Richards
B. Faulkenberry
J. Sloan, PV-SRI
R. Rosano, OE
bcc w/o enclosure:
M. Smith
J. Zollicoffer
J. Bianchi
RV
"w
DSolorio
JRussell
HWong
CVanDenburgh
DKirsch
5 / v;193
/,/93
f //,93
/
/93
1 /Ly/93
RE
T COPY
COPY ]REQUEST COPY
REQUEST COPY ] R EST COPY]
r AS)
NII
NO
1
YES /NO
1
YES/NO
1 3'jjINO1
ichard
CRean
PMorrill (para 8.c)
J
(Para 3.b)
/9
1/793
//93
19
93
[REQ
T COPY ]REQUST COPY ]REQUEST COPY ]REQUSTCg]
S
NO
]
/ NO
1
YES-/
-NO 1YES
/
[ SEND TO DCS
NO ]
r SEND TO POR 1
NO 1
-3
bcc w/enclosure:
Project Inspector
Resident Inspector
Docket File
G. Cook
S. Richards
B. Faulkenberry
J. Sloan, PV-SRI
R. Rosano, OE
05
-4
bcc w/o enclosure:
M. Smith
J. Zollicoffer
J. Bianchi
RV
DSolorio*
JRussell*
HWong*
CVanDenburgh
DKirsch*
9/22/93
9/22/93
9/27/93
q /2 793
9/27/93
[R
ST COPY ] R
ST COPY ] R E
T COPY
R
COPY
REQUEST COPY]
rYES VNO
1
ES / NO
E
AS V NO
I
ES / NO
YES /NO
CRegan*
P orrill (para 8.c)
JReese (para 3.b)
9/27/93
"Af /93
4/24/93 W
[RPKST COPY]
ST COPY ]
REQUEST
PY ]
r/ YES/
NO
YES
NO
1
YES
N
SEE PREVIOUS CONCURRENCES
[SEND TO DCS ]
/NO ]
r SEND TO PDR ] gES) NO I
G:\\PS2\\SONGS\\INSPRPTS\\SO93-26.CAV