Text
t REGUZ
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1450 MARIA LANE
WALNUT CREEK, CALIFORNIA 94596-5368
JUL - 8 1993
Dockets:
50-206, 50-361, 50-362
Southern California Edison Company
Irvine Operations Center
23 Parker Street
Irvine, California 92718
Attention:
Mr. Harold B. Ray
Senior Vice President, Nuclear
Subject:
NRC INSPECTION OF SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 1,
2 AND 3 REPORT NOS. 50-206/93-15, 50-361/93-15 AND 50-362/93-15
This refers to the routine inspection conducted by Mr. Louis C. Carson II of
this office on June 7-18, 1993, of the activities authorized by NRC License
Nos. DPR-13, NPF-10, and NPF-15, and to the'findings discussed with Mr. J. Fee
and other members of your staff identified in the enclosed report.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
No violations or deviations were identified during this inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be glad to
discuss them with you.
Si
erely,
Ja
ese,
lef
a
ities Radiol gical Protection
Branch
Enclosure:
Inspection Report Nos. 50-206/93-15, 50-361/93-15, 50-362/93-15
9307260132 930708
ADOCK 05000206
G
2
Inspection Report Nos. 50-206/93-15, 50-361/93-15, 50-362/93-15
Mr. Harold B. Ray
Senior Vice President, Nuclear
cc w/enclosures:
Mr. Edwin A. Guiles, Vice President Engineering & Operations, San Diego Gas
and Electric Co.
James A. Beoletto, Esq., Southern California Edison Company
Chairman, Board of Supervisors, County of San Diego
Alan R. Watts, Esq., Rourke & Woodruff
Mr. Sherwin Harris, Resource Project Manager, Public Utilities Department
Mr. Charles B. Brinkman, Manager, ABB Combustion Engineering Nuclear Power
Mr. R. W. Krieger, Station Manager, Southern California Edison Company
Mr. Don J. Womeldorf, Chief, Environmental Management Branch
Mr. Richard J. Kosiba, Project Manager, Bechtel Power Corporation
Mr. Robert G. Lacy, Manager Nuclear Department
Mr. Steve Hsu, Radiologic Health Branch
Mayor, City of San Clemente
3
Inspection Report Nos. 50-206/93-15, 50-361/93-15, 50-362/93-15
Mr. Harold B. Ray
Senior Vice President, Nuclear
bcc w/enclosures:
Docket File
G. Cook
B. Faulkenberry
Resident Inspector
Project Inspector
bcc w/o enclosures:
M. Smith
J. Zollicoffer
LCarson
J
s