November 30, 1992 Docket No. 50-206 Mr. Harold B. Ray Senior Vice President Southern California Edison Co.
Irvine Operations Center 23 Parker Street Irvine, California 92718
Dear Mr. Ray:
SUBJECT:
SAN ONOFRE NUCLEAR GENERATING STATION, UNIT NO. 1 TEN YEAR INSERVICE INSPECTION RELIEF REQUESTS (TAC NO. M84349)
By letter dated August 7, 1992, Southern California Edison (SCE) requested schedular relief from certain second ten-year interval Inservice Inspections (ISI's) for San Onofre Nuclear Generating Station, Unit 1. These inspections are currently required by the Technical Specifications (TS) which referencesSection XI of the ASME Code. Your letter also requested relief from the reporting requirements for the second ten-year interval ISI and included your plans for the third ten-year interval ISI program. These requests were developed in association with the planned permanent shutdown of San Onofre Unit 1 at the end of November 1992.
The staff has reviewed and evaluated your requests and the supporting information. Based on the information submitted we have concluded that the request to extend the interval for the second ten-year ISI program plan for six months is acceptable and is granted. Your request for relief from the requirement to submit the third ten-year interval ISI program plan is also granted provided shutdown of San Onofre, Unit 1 occurs as presently planned.
Your request not to prepare and submit the Owner's Report for Inservice Inspections, Form NIS-1, is denied. The staff's evaluations and conclusions are presented in the enclosed Safety Evaluation.
Sincerely, original signed by J. Clifford for Theodore R. Quay, Director Project Directorate V 1
UU3J Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation
Enclosure:
DISTRIBUTION As stated fDocket Files NRC & Local PDRs DFoster JRoe MVirgilio DHagan cc w/enclosure:
ONO See next page JStrosnider CGrimes Region V (4) cOnM OC/LFDCB KPerkins, RV JBradfute "40 q-40 PDV Reading File PDV Plant File GHill (4) ooe OPA SWeiss See previous concurrence o
OFC f.A/PDV
^PM/PDV
- OGC NAME DFoster JBradfute JHull TQuay DATE
/
/92
/
/92 11/27/92
%k
/30/92 NRC & Local PDI DIse OFFICIAMLrgli DEOD OY agan NM:S834.T
Docket No. 50-206 Mr. Harold B. Ray Senior Vice President Southern California Edison Co.
Irvine Operations Center 23 Parker Street Irvine, California 92718
Dear Mr. Ray:
SUBJECT:
SAN ONOFRE NUCLEAR GENERATING STATION, UNIT NO. 1 N YEAR INSERVICE INSPECTION RELIEF REQUESTS (TAC NO. M84 49)
By letter dated August 7, 1992, Southern California Ediso (SCE) requested schedular relief from certain second ten-year interval I service Inspections (ISI's) for San Onofre Nuclear Generating Station, Unit 1. These inspections are currently required by the Technical Specification (TS) which referencesSection XI of the ASME Code. Your letter also requ ted relief from the reporting requirements for the second ten-year int val ISI and included your plans for the third ten-year interval ISI progra.
These requests developed in association with the planned permanent shutd n of San Onofre Unit 1 at the end of November 1992.
The staff has reviewed and evaluated your r quests and the supporting information. Based on the information su itted we have concluded that the request to extend the interval for the s cond ten-year ISI program plan for six months may be and hereby is authori ed.
Your request for relief from the requirement to submit the third ten-y r interval ISI program plan is also granted provided shutdown of San Ono re, Unit 1 occurs as presently planned.
Your request not to prepare and su it the Owner's Report for Inservice Inspections, Form NIS-1, is denie.
The staff's evaluations and conclusions are presented in the enclosed S ety Evaluation.
Sincerely, Theodore R. Quay, Director Project Directorate V Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation
Enclosure:
DISTRIBUTION As stated Docket Files NRC & Local PDRs DFoster JRoe MVirgilio DHagan cc w/enclosu e:
See next p e JStrosnider CGrimes Region V (4)
OC/LFDCB KPerkins, RV JBradfute PDV Reading File PDV Plant File GHill (4)
OPA SWeiss
- Se previous concurrence
\\
A' 0
LA/PDV PM P
- OGC D/PDV NAME JB' e
JHull TQuay DATE, it /3o/92 3'a/*1/92 11/27/92
/
/92 OFFICIAL RECORD COPY DOCUMENT NAME:SO84349.LTR
- REG UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 November 30, 1992 Docket No. 50-206 Mr. Harold B. Ray Senior Vice President Southern California Edison Co.
Irvine Operations Center 23 Parker Street Irvine, California 92718
Dear Mr. Ray:
SUBJECT:
SAN ONOFRE NUCLEAR GENERATING STATION, UNIT NO. 1 TEN YEAR INSERVICE INSPECTION RELIEF REQUESTS (TAC NO. M84349)
By letter dated August 7, 1992, Southern California Edison (SCE) requested schedular relief from certain second ten-year interval Inservice Inspections (ISI's) for San Onofre Nuclear Generating Station, Unit 1. These inspections are currently required by the Technical Specifications (TS) which referencesSection XI of the ASME Code. Your letter also requested relief from the reporting requirements for the second ten-year interval ISI and included your plans for the third ten-year interval ISI program. These requests were developed in association with the planned permanent shutdown of San Onofre Unit 1 at the end of November 1992.
The staff has reviewed and evaluated your requests and the supporting information. Based on our review of the information submitted we have concluded that the request to extend the interval for the second ten-year ISI program plan for six months is acceptable and is granted. Your request for relief from the requirement to submit the third ten-year interval ISI program plan is also granted provided shutdown of San Onofre, Unit 1 occurs as presently planned. Your request not to prepare and submit the Owner's Report for Inservice Inspections, Form NIS-1, is denied. The staff's evaluations and conclusions are presented in the enclosed Safety Evaluation.
Sincerely, TKeodore Qu Director Project Directorate V Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/enclosure:
See next page
Mr. Harold B. Ray San Onofre Nuclear Generating Southern California Edison Company Station, Unit No. 1 cc:
Mr. Howard J. Wong Mr. Richard J. Kosiba, Project Manager U.S. Nuclear Regulatory Commission Bechtel Power Corporation Region V 12440 E. Imperial Highway 1450 Maria Lane, Suite 210 Norwalk, California 90650 Walnut Creek, California 94596 Mr. Robert G. Lacy Manager, Nuclear Department San Diego Gas & Electric Company P. 0. Box 1831 San Diego, California 92112 Resident Inspector/San Onofre NPS c/o U.S. Nuclear Regulatory Commission P. 0. Box 4329 San Clemente, California 92674 Mayor City of San Clemente 100 Avenida Presidio San Clemente, California 92672 Chairman, Board of Supervisors County of San Diego 1600 Pacific Highway, Room 335 San Diego, California 92101 Regional Administrator, Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Mr. Hank Kocol Radiologic Health Branch State Department of Health Services Post Office Box 942732 Sacramento, California 94234 Mr. Don J. Womeldorf Chief, Environmental Management Branch California Department of Health Services 714 P Street, Room 616 Sacramento, California 95814