ML13312A537
| ML13312A537 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 12/28/1979 |
| From: | James Drake SOUTHERN CALIFORNIA EDISON CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8001070440 | |
| Download: ML13312A537 (3) | |
Text
RGULATOY ;
MAIHUN DISTRIBUTIUN SYSTE NiOS)
.ACCESSION NBR:8001070440 0OC,DATL: 79/12/28 NOTARIZED: NO DOCKET 4 FACIL:5o"26 San Onofre Nuclear Station, Unit 1, Southern Californ 0500u206 50" S ban Onofre Nuclear Station, Unit.2, Southern Californ 050003b1 an Unofre Nuclear Station, Unit 3, Southern Californ 05000362 AUi AUTHUR AFFILIATION ONAKE,JH.
Southern California Ecison Co.
kECiP.NAME RECIPIENT AFFILIATION D)ENTUN,H.R.
Office of Nuclear Reactor Regulation
SUBJECT:
Notifies of realignment of organizational responsoilities for design const & operation of units to achieve greater effectiveness.New deot created to assume chief responsioility,R Uietch named as vice President.
DISTRISUTION CODE: M0063 COPIES RECEIVED:LTR.L ENCL A=) SIZE TITLE: Changes of Personnel/Aadress YO 4FA-O1Z r'_1
'4--<,WIP4 RECIPINT COPIES RECIPIENF COPILS Iu 00 NAM LT IR ENCL ID CUOE/NAME LTTR ENCL A.CI ION:
04 L fw
- p.
05 P 1,1 12 AL)P. X/Jd./<./7 1
BC oAn a* 'z.1 IN1RNAL: 0 NC POR 1
0 0,3 :14PA I
09 ASL6 1
10 ASLAP 1
1 11 ULSENN, 1
14 I&E 2
EXFERNfAL: 03 LPDR 1
13 ACHS 1
zf 7R
/ 7 5c<
TUA3 CEQ
'9 FTTAL NU~bER OF COPIES REQUIRED'. L TN 3
E NC L 4<
Southern California Edison Company R o. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD, CALIFORNIA 91770 J. H. DRAKE December 28, 1979 TELEPHONE vice PREON213-572-2258 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Denton:
Subject:
Docket Nos. 50-206, 50-361 and 50-362 San Onofre Nuclear Generating Station Units 1, 2 and 3 As was discussed with you on December 13, 1979, effective January 1, 1980, Edison is realigning organizational responsibilities for the design, construction and operation of our nuclear units to more effectively manage this critical function. Specifically, the following changes are being accomplished.
(a) A new department, Nuclear Engineering and Operations, will have primary responsibility for the design, construction and operation of our nuclear units. Mr. R. Dietch has been appointed Vice President, Nuclear Engineering and Operations.
(b) Dr. L. T. Papay has been appointed Vice President, Advanced Engineering and will have responsibility for our Quality Assurance Program.
(c) Mr. A. Arenal will assume responsibility for the Engineering and Construction Department upon my retirement effective January 1, 1980.
It is requested that all future correspondence concerning San Onofre Units 1, 2 and 3 from the Office of Nuclear Reactor Regulation and the Office of Nuclear Material Safety and Safeguards be directed to Mr. R. Dietch. The Office of Inspection and Enforcement has been advised by separate correspondence of our organizational realignment and the appropriate addressee for correspondence originating from that office.
Sincerely, M0oo(
/
//
0 0 i 0 7 0 ~~
-2 cc:
Mr. W. J. Dircks, Director Office of Nuclear Material Safety and Safeguards Mr. D. L. Ziemann, Chief Operating Reactors Branch #2 Division of Operating Reactors Mr. R. L. Baer, Chief Light Water Reactors Branch #2 Division of Project Management