AC40 - RA NRC MONTHLY OPERATING REPORT DOCKET NO.
50-206
)ATE -T7U78!
COMPLETED BY J.M.JOY TELEPHONE (714)492-7700 OPERATING STATUS I. Unit Name:
SAN ONOFRE NUCLEAR GENERATING STATION
- 2. Reporting Period:
December 1, 1980 through December 31, 1980 R Piod 34
- 3. Licensed Thermal Power (MWt):
4bb
- 4. Nameplate Rating (Gross MWe):
436
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
456
- 7. Maximum Dependable Capacity (Net MWe):.
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N.A.
- 9. Power Level To Which Restricted, If Any (Net MWe):
N.A.
- 10. Reasons For Restrictions, If Any:
N.A.
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744 8785 117,321.3
- 12. Number Of Hours Reactor Was Critical 0
1979.1 84,611.4
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 0
1961.5 81,114.1
- 15. Unit Reserve Shutdown flours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 0 2,552,787 104,084,261
- 17. Gross Electrical Energy Generated (MWH) 0 855,000 35,526,434
- 18. Net Electrical Energy Generated (MWH) 0 816.676 33,664,042
- 19. Unit Service Factor 0
22.8 68.3
- 20. Unit Availability Factor 0
22.8 68.3
- 21. Unit Capacity Factor (Using MDC Net) 0 21.3 69.3
- 22. Unit Capacity Factor (Using DER Net) 0 21.3 69.3
- 23. Unit Forced Outage Rate 100 65-5 13.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
Steam Generator Repair in progress.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
April 15, 1981
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
_cCE Psso(I 371 NEW 8/78 810.1 2ts0I1&
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-206 UNIT SONGS-1 DATE 1/07/81 COMPLETED BYJ. M. JOY TELEPHONE (714) 4927700 MONTH
- DECEMBER, 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
10 027 0
12 0
28 0
13 0
29 0
14 0
30 0
15 03 0
16 0
PSSO(f) 371 NEW 8/78
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET
.OS-2O6 UNIT NAME -UNb-/I DATE NDecember, 1980 COMPLETED BY J. M. JOY REPORT MONTH TEEHN 74 9-7700 TELEPHONE (714)L492~1Q Licensee Cause & Corrective Ni.
Date Event Action to Report 2 (O Prevent Recurrence 55 80-07-12 F
4153 B
1 80-014 CC HTEXCH STEAM GENERATOR TUBE REPAIR 34 F: Forced Reason:
Method:
Exhibit F - Instructions S; Scheduled A-Equipment Failure (Explain)
!-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entrv Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report ([ER) File (?LURliG D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
Exhibit H-Sane Source r-they (Efxplain)
PSSO(l) 371 NEW 8/78
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.
50-206 UNIT SONGS-1 DATE 1/07/81 COMPLETED BY).M. JOY TELEPHONE (714) 492-7700 The unit remained in cold shutdown for the entire month for steam generator tube repair.
Pssob()
371 NEW 8/78
REFUELING INFORMATION DOCKET NO.
50-206 UNIT SONGS-1 DATE 1/07/81 COMPLETED BY J.M.JOY TELEPHONE (714) 492-7700
- 1. Scheduled date for next refueling shutdown.
Not yet determined.
- 2. Scheduled date for restart following refueling.
April 15, 1981
- 3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Yes What will these be?
Proposed Change No. 88 to POL DPR-13, Appendix A, Technical Specification 3.5.2, Control Rod Insertion Limits.
- 4. Scheduled date for submitting proposed licensing action and supporting information.
February 8, 1981
- 5. Important licensing considerations associated with refueling, e.g.
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
None
- 6. The number of fuel assemblies.
a) In the core 157 b) In the spent fuel storage pool.
94
- 7. Licensed spent fuel storage capacity.
216 Intended change in spent fuel storage capacity.
None
- 8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
April 1983 PSSO(i) 371 NEW 8/78