Monthly Operating Rept for Nov 1980
ML13311B108
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 12/08/1980
From: Joy J
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML13311B107 List:
References
NUDOCS 8012160338
Download: ML13311B108 (5)


Text

AC40 - RA NRC MONTHLY OPERATING REPORT DOCKET NO..0-2n6 DATE 12/8B COMPLETED BY I.. 30y TELEPHONE (714) 492-7700 OPERATING STATUS I. UnitName:

San Onofre Nuclear Generatina Station, Unit 1

2. Reporting Period:

November 1, 1980 through Hovember 31, 1980

3. Licensed Thermal Power (MWt):

1347

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

436

6. Maximum Dependable Capacity (Gross MWe):

456

7. Maximum Dependable Capacity (Net MWe):

436

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N.A.

9. Power Level To Which Restricted, If Any (Net MWe):

N.A.

10. Reasons For Restrictions. If Any:

N.A.

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 720 8041 118,040
12. Number Of Hours Reactor Was Critical 0

1979.1 84,611.4

13. Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line 0

.1961.5 81,114.1

15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 0 2,552,787 104,084,261
17. Gross Electrical Energy Generated (MWH) 0 855,000 35,526,434
18. Net Electrical Energy Generated (MWH) 0 816,676 33,664,042
19. Unit Service Factor 0

24.4 68.7

20. Unit Availability Factor 0

24.4 68.7

21. Unit Capacity Factor (Using MDC Net) 0 23.2 69.8
22. Unit Capacity Factor (Using DER Net) 0 23.2 69.8
23. Unit Forced Outage Rate 100 60.3 13.2
24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):

Steam Generator Repair In Progress

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

April 16. 1Q1

26. Units In Test Status (Prior to Commercial Operation): N.A.

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 801216033<'T stE Psso t) 371 NEW s/7

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-206 UNIT SONGS-1 DATE 12/8/80 COMPLETED BY

.M. sJo TELEPHONE (714) 492-7700 MONTH November 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

60 22 0

7 0

23 0

8 0

24 0

9 0

2s 0

10 0

26 0

1 1 0

27 0

12 0

28.

0 13 0

29 0

14 30 0

15 0

31 16 0

PSS(r) 371 NEW

/7S

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50- 206 UNIT NAME SONGS-1 DATE 12/A /ll COMPLETED BY J.M JOy REPORT MONTH November TELEPHONE (714) 492-7700 Licensee 1=

Cause & Corrective No.

Date Event Action to Report &

E L

Prevent Recurrence 55 80-7-12 F

3409 B

1 80-014 CC HT EXCH STEAM GENERATOR TUBE REPAIR 3

4 F: Forced Reason:

Method:

Exhibit F instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation ot Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refucling

..A 3-Automatic Scram.

Fveni Repi i U R) Fil INLIG D-Regulatory Restriction 4-Other (Explain) 0161 I-Operator Training & License Examination F-Administrative G-Opeiational Error (Explain)

Fxhibit - Sjic Smirce IfI-Othe (1 xplain)

PEty(S) het NEW L/7i

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.

50-206 UNIT SONGS-1 DATE 12/8/80 COMPLETED BY J. M. Joy TELEPHONE (714) 492-7700 The Unit remained in cold shutdown for the entire month for steam generator tube repair.

Psso(i) 371 NEW s/78

REFUELING INFORMATION DOCKET NO.

50-206 UNIT SONGS-1 DATE 12/8/80 COMPLETED BY J.M. Joy TELEPHONE (714)492-7700

1. Scheduled date for next refueling shutdown.

Not yet determined.

2. Scheduled date for restart following refueling.

April 15, 1981

3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Yes What will these be?

Proposed Change No. 88 to POLDPR-13, Appendix A, Technical Specification 3.5.2, Control Rod Insertion Limits

4. Scheduled date for submitting proposed licensing action and supporting information.

February 8, 1981

5. Important licensing considerations associated with refueling, e.g.

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

None

6. The number of fuel assemblies.

a) In the core 157 b) In the spent fuel storage pool.

94

7. Licensed spent fuel storage capacity.

216 Intended change in spent fuel storage capacity.

None

8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

April 1983 Sso(l) 371 New S/7S