AC40 - RA NRC MONTHLY OPERATING REPORT DOCKET NO..0-2n6 DATE 12/8B COMPLETED BY I.. 30y TELEPHONE (714) 492-7700 OPERATING STATUS I. UnitName:
San Onofre Nuclear Generatina Station, Unit 1
- 2. Reporting Period:
November 1, 1980 through Hovember 31, 1980
- 3. Licensed Thermal Power (MWt):
1347
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
436
- 6. Maximum Dependable Capacity (Gross MWe):
456
- 7. Maximum Dependable Capacity (Net MWe):
436
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N.A.
- 9. Power Level To Which Restricted, If Any (Net MWe):
N.A.
- 10. Reasons For Restrictions. If Any:
N.A.
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 720 8041 118,040
- 12. Number Of Hours Reactor Was Critical 0
1979.1 84,611.4
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 0
.1961.5 81,114.1
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 0 2,552,787 104,084,261
- 17. Gross Electrical Energy Generated (MWH) 0 855,000 35,526,434
- 18. Net Electrical Energy Generated (MWH) 0 816,676 33,664,042
- 19. Unit Service Factor 0
24.4 68.7
- 20. Unit Availability Factor 0
24.4 68.7
- 21. Unit Capacity Factor (Using MDC Net) 0 23.2 69.8
- 22. Unit Capacity Factor (Using DER Net) 0 23.2 69.8
- 23. Unit Forced Outage Rate 100 60.3 13.2
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
Steam Generator Repair In Progress
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
April 16. 1Q1
- 26. Units In Test Status (Prior to Commercial Operation): N.A.
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 801216033<'T stE Psso t) 371 NEW s/7
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-206 UNIT SONGS-1 DATE 12/8/80 COMPLETED BY
.M. sJo TELEPHONE (714) 492-7700 MONTH November 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
60 22 0
7 0
23 0
8 0
24 0
9 0
2s 0
10 0
26 0
1 1 0
27 0
12 0
- 28.
0 13 0
29 0
14 30 0
15 0
31 16 0
PSS(r) 371 NEW
/7S
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50- 206 UNIT NAME SONGS-1 DATE 12/A /ll COMPLETED BY J.M JOy REPORT MONTH November TELEPHONE (714) 492-7700 Licensee 1=
Cause & Corrective No.
Date Event Action to Report &
E L
Prevent Recurrence 55 80-7-12 F
3409 B
1 80-014 CC HT EXCH STEAM GENERATOR TUBE REPAIR 3
4 F: Forced Reason:
Method:
Exhibit F instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation ot Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refucling
..A 3-Automatic Scram.
Fveni Repi i U R) Fil INLIG D-Regulatory Restriction 4-Other (Explain) 0161 I-Operator Training & License Examination F-Administrative G-Opeiational Error (Explain)
Fxhibit - Sjic Smirce IfI-Othe (1 xplain)
PEty(S) het NEW L/7i
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.
50-206 UNIT SONGS-1 DATE 12/8/80 COMPLETED BY J. M. Joy TELEPHONE (714) 492-7700 The Unit remained in cold shutdown for the entire month for steam generator tube repair.
Psso(i) 371 NEW s/78
REFUELING INFORMATION DOCKET NO.
50-206 UNIT SONGS-1 DATE 12/8/80 COMPLETED BY J.M. Joy TELEPHONE (714)492-7700
- 1. Scheduled date for next refueling shutdown.
Not yet determined.
- 2. Scheduled date for restart following refueling.
April 15, 1981
- 3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Yes What will these be?
Proposed Change No. 88 to POLDPR-13, Appendix A, Technical Specification 3.5.2, Control Rod Insertion Limits
- 4. Scheduled date for submitting proposed licensing action and supporting information.
February 8, 1981
- 5. Important licensing considerations associated with refueling, e.g.
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
None
- 6. The number of fuel assemblies.
a) In the core 157 b) In the spent fuel storage pool.
94
- 7. Licensed spent fuel storage capacity.
216 Intended change in spent fuel storage capacity.
None
- 8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
April 1983 Sso(l) 371 New S/7S