AC40 - RA NRC MONTHLY OPERATING REPORT DOCKET NO.
50-206 DATE 10-07-80 COMPLETED BY J. M. JOY TELEPHONE (T714)4/9-7700 OPERATING STATUS
- 1. Unit Name:
SAN ON0FRE NUCLEAR GENERATING STATION - UNIT 1
- 2. Reporting Period:
September 1, 1980 through September 30, 1980
- 3. Licensed Thermal Power (MWt):
1347
- 4. Nameplate Rating (Gross MWe):
456
- 5. Design Electrical Rating (Net MWe):
436
- 6. Maximum Dependable Capacity (Gross MWe):
456 7.. Maximum Dependable Capacity (Net MWe):
436
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N.A.
- 9. Power Level To Which Restricted, If Any (Net MWe):
N. A.
- 10. Reasons For Restrictions. If Any:
N.A.
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 720 6576 116,552.3
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 0
0
- 14. Hours Generator On-Line 0
1961.5 81,114.1
- 15. Unit Reserve Shutdown Hours 0
0
- 16. Gross Thermal Energy Generated (MWH) 0 2,552,787 104,084,261
- 17. Gross Electrical Energy Generated (MWH) 0 855,000 35,526,434
- 18. Net Electrical Energy Generated (MWH) 0 816,676 33,664,042
- 19. Unit Service Factor 0
.8 69.6 0
2.8
- 6.
- 20. Unit Availability Factor 29.8 797
- 21. Unit Capacity Factor (Using MDC Net) 0 28.4 70.7 0
28.4 I.
- 22. Unit Capacity Factor (Using DER Net) 100 43.7
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
Steam Generator Repair in Progress
- 25. If Shut Dow.n At End Of Report Period. Estimated Date of Startup.
December 1 5, 1 980
- 26. Units In Test Status (Prior to Commercial Operation):
N.A.
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY.
-COMMERCIAL OPERATION_______
80 10 151,
,SCE PSSO (1) 371 N EW 8/78
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-206 UNIT SONGS-1 DATE 10/07/80 COMPLETED BY J. M. JOY TELEA E 492-7700 MONTH SEPTEMBER, 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net)
I 0
17 0
2 0
Is 0
3 0
19 0
4 0
20 0
5 0
2 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
_7 0
12 0
0 13 0
29 0
14 0
30 0
Is 0
31 16 0
PSSO(1) 371 NEW
/78
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50 UNIT NAME DATE I
U/U7/ 8U SEPTEMBER, 1980 COMPLETED BY J.M. JOY REPORT MONTH TELEPHONE (714) 492-7700 Licensee Cause & Corrective DeEvent
- 25. ?
Action to NC.
F, U5 Report t Prevent Recurrence 55 8-07-12 F
1944 B
1 80-014 CC HTEXCH Steam Generator Tube Repair 2
3 4
F: Forced Reason:
Method:
Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain)
!-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
Exhibit H-Sinc SoUrce H1-Othef (Explain)
PSSO(I) 371 NEW 8/78
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.
50-206 UNIT SONGS-1 DATE 10/07/80 COMPLETED BY J.M. JOY TELEPHONE (714) 492-7700 The unit remained in cold shutdown for the entire month for steam generator tube repair.
Pssob()
371 NEW 8/78
REFUELING INFORMAT*
DOCKET NO.50-206 U &PGS-1 DATE 10/07/80 COMPLETED BY J.M.JOY TELEPHONE (714) 492-7700
- 1. Scheduled date for next refueling shutdown.
Not yet determined..
- 2. Scheduled date for restart following refueling.
December 15, 1980
- 3. Will refueling or resumpfion of operation thereafter require a Technical Specification change or other license amendment?
Yes What will these be?
Proposed Change No. 88 to POL DPR-13, Appendix A, Technical Specification 3.5.2, Control Rod Insertion Limits.
- 4. Scheduled date for submitting proposed licensing action and supporting information.
February 8, 1980
- 5. Important licensing considerations associated with refueling, e.g.
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
None
- 6. The number of fuel assemblies.
a) In the core 157 b) In the spent fuel storage pool.
94
- 7. Licensed spent fuel storage capacity.
216 Intended change in spent fuel storage capacity..
None
- 8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
April 1983 Psso(,) 371 NEW 8/78