Monthly Operating Rept for Sept 1980
ML13311B099
Person / Time
Site: San Onofre 
Issue date: 10/07/1980
From: Joy J
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML13311B097 List:
References
NUDOCS 8010150454
Download: ML13311B099 (5)


Text

AC40 - RA NRC MONTHLY OPERATING REPORT DOCKET NO.

50-206 DATE 10-07-80 COMPLETED BY J. M. JOY TELEPHONE (T714)4/9-7700 OPERATING STATUS

1. Unit Name:

SAN ON0FRE NUCLEAR GENERATING STATION - UNIT 1

2. Reporting Period:

September 1, 1980 through September 30, 1980

3. Licensed Thermal Power (MWt):

1347

4. Nameplate Rating (Gross MWe):

456

5. Design Electrical Rating (Net MWe):

436

6. Maximum Dependable Capacity (Gross MWe):

456 7.. Maximum Dependable Capacity (Net MWe):

436

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N.A.

9. Power Level To Which Restricted, If Any (Net MWe):

N. A.

10. Reasons For Restrictions. If Any:

N.A.

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 720 6576 116,552.3
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0

0

14. Hours Generator On-Line 0

1961.5 81,114.1

15. Unit Reserve Shutdown Hours 0

0

16. Gross Thermal Energy Generated (MWH) 0 2,552,787 104,084,261
17. Gross Electrical Energy Generated (MWH) 0 855,000 35,526,434
18. Net Electrical Energy Generated (MWH) 0 816,676 33,664,042
19. Unit Service Factor 0

.8 69.6 0

2.8

6.
20. Unit Availability Factor 29.8 797
21. Unit Capacity Factor (Using MDC Net) 0 28.4 70.7 0

28.4 I.

22. Unit Capacity Factor (Using DER Net) 100 43.7
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

Steam Generator Repair in Progress

25. If Shut Dow.n At End Of Report Period. Estimated Date of Startup.

December 1 5, 1 980

26. Units In Test Status (Prior to Commercial Operation):

N.A.

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY.

-COMMERCIAL OPERATION_______

80 10 151,

,SCE PSSO (1) 371 N EW 8/78

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-206 UNIT SONGS-1 DATE 10/07/80 COMPLETED BY J. M. JOY TELEA E 492-7700 MONTH SEPTEMBER, 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net)

I 0

17 0

2 0

Is 0

3 0

19 0

4 0

20 0

5 0

2 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

_7 0

12 0

0 13 0

29 0

14 0

30 0

Is 0

31 16 0

PSSO(1) 371 NEW

/78

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50 UNIT NAME DATE I

U/U7/ 8U SEPTEMBER, 1980 COMPLETED BY J.M. JOY REPORT MONTH TELEPHONE (714) 492-7700 Licensee Cause & Corrective DeEvent

25. ?

Action to NC.

F, U5 Report t Prevent Recurrence 55 8-07-12 F

1944 B

1 80-014 CC HTEXCH Steam Generator Tube Repair 2

3 4

F: Forced Reason:

Method:

Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain)

!-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

Exhibit H-Sinc SoUrce H1-Othef (Explain)

PSSO(I) 371 NEW 8/78

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.

50-206 UNIT SONGS-1 DATE 10/07/80 COMPLETED BY J.M. JOY TELEPHONE (714) 492-7700 The unit remained in cold shutdown for the entire month for steam generator tube repair.

Pssob()

371 NEW 8/78

REFUELING INFORMAT*

DOCKET NO.50-206 U &PGS-1 DATE 10/07/80 COMPLETED BY J.M.JOY TELEPHONE (714) 492-7700

1. Scheduled date for next refueling shutdown.

Not yet determined..

2. Scheduled date for restart following refueling.

December 15, 1980

3. Will refueling or resumpfion of operation thereafter require a Technical Specification change or other license amendment?

Yes What will these be?

Proposed Change No. 88 to POL DPR-13, Appendix A, Technical Specification 3.5.2, Control Rod Insertion Limits.

4. Scheduled date for submitting proposed licensing action and supporting information.

February 8, 1980

5. Important licensing considerations associated with refueling, e.g.

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

None

6. The number of fuel assemblies.

a) In the core 157 b) In the spent fuel storage pool.

94

7. Licensed spent fuel storage capacity.

216 Intended change in spent fuel storage capacity..

None

8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

April 1983 Psso(,) 371 NEW 8/78