AC40 - RA NRC MONTHLY OPERATING REPORT DOCKET NO.
50-206 DATE 8/6L1980 COMPLETED BY J1. M.-10Y TELEPHONE (714)492-7700 OPERATING STATUS
- 1. Unit Name:
San Onofre Nuclear Generating Station
- 2. Reporting Period:
July 1, 1980 to July 31, 1980
- 3. Licensed Thermal Power (MWt):
1347
- 4. Nameplate Rating (Gross MWe):
456
- 5. Design Electrical Rating (Net MWe):
436
- 6. Maximum Dependable Capacity (Gross MWe):
456
- 7. Maximum Dependable Capacity (Net MWe):
436
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N. A.
- 9. Power Level To Which Restricted, If Any (Net MWe):
N. A.
- 10. Reasons For Restrictions, If Any:
N.A.
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744 5112 115,088.3
- 12. Number Of Hours Reactor Was Critical 0
1979.1 84,611.4
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 0
1961.5 81,114.1
- 15. Unit Reserve Shutdown Hours 0
0 -
0
- 16. Gross Thermal Energy Generated (MWH) 0 2,552,787 104,084,261
- 17. Gross Electrical Energy Generated (MWH) 0 855,000 35,526,434
- 18. Net Electrical Energy Generated (MWH) 0 816,676 33,664,042
- 19. Unit Service Factor 0
38.4 70.5
- 20. Unit Availability Factor 0
38.4 70.5
- 21. Unit Capacity Factor (Using MDC Net) 0 36.5 71.6
- 22. Unit Capacity Factor (Using DER Net) 0 36.5 71.6
- 23. Unit Forced Outage Rate 100 21.5 9.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Steam Generator repair in progress
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
11/01/80
- 26. Units In Test Status (Prior to Commercial Operation):
N.A.
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8008 20o sCE Psso(1) 37t NEW 8/78
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-206 UNIT SONGS-1 DATE 8/06/8o COMPLETEDBY J. M. JOY TELEPHONE (714) 492-7700 MONTH JULY, 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 0 0
1 17 2
0
-s18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0_
27 0
12 0
28 0
13 0
9 0
14 0
30 0
15 0
31 0
16
_A_L PSSO(i) 371 NEW 8/78
50-206 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
5_06 UNIT NAME DATE 8/06 80 REPORT MONTH JULY, 1980 COMPLETED BY J.M. JOY TELEPHONE (714) 492-77011 Licensee Cause & Corrective Date Event 7
oAction to Report a Prevent Recurrence 55 80-04-09 S 2241.7 S
1 N.A.
ZZ ZZZZZ REFUELING 55 80-07-12 F
480 B
1 80-014 CC HTEXCH STEAM GENERATOR. TUBE REPAIR 3
4 F: Forced Reason:
Method:
Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain)
!-Manual for Preparation ot Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report ( LER) File (NUREG D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
Exhibit H-Smnne Source ll-Othci (Explain)
Psso(h) 371 NEW 8/7
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH 50-206 DOCKET NO._______
UNIT SONGS-1 DATE 8/06/80 COMPLETED BY J.M. Joy TELEPHONE (714) 492-7700 f
The unit was shutdown for routine refueling and maintenance at the beginning of the month. On July 11, 1980 maintenance on the turbine was completed.
The unit remained in cold shutdown for the rest of the month for steam generator tube inspection and repair.
Psso(i) 371 NEW 8/78
REFUELING INFORMATION DOCKET NO.
50-206 UNIT SONGS-1 DATE 8/06/80 COMPLETED BY J.M.JOY TELEPHONE (714) 492-7700 1.
Scheduled date for next refueling shutdown.
Not yet determined.
- 2. Scheduled date for restart following refueling.
November 1, 1980
- 3. Will refueling or resumption of operation-thereafter require a Technical Specification change or other license amendment?
Yes What will these be?
Proposed Change No. 88 to POL DPR-13, Appendix A, Technical Specification 3.5.2, Control Rod-Insertion Limits.
- 4. Scheduled date for submitting proposed licensing action and supporting information.
February 8, 1980
- 5. Important licensing considerations associated with refueling, e.g.
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
None
- 6. The number of fuel assemblies.
a) In the core 157 b) In the spent fuel storage pool.
97
- 7. Licensed spent fuel storage capacity.
216 Intended change in spent fuel storage capacity.
None
- 8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
April 1983 PSSO(i) 371 NEW 8/78