AC40 - RA NRC MONTHLY OPERATING REPORT DOCKET NO.
50-206 DATE _6/9180 COMPLETED BY
.M.JOY TELEPHONE 4714) 492-7700 OPERATING STATUS
- 1. UnitName: San Onofre Nuclear Generating Station-Unit I
- 2. Reporting Period:
May 1, 1980 to May 31, 1980
- 3. Licensed Thermal Power (MWt):
1347
- 4. Nameplate Rating (Gross MWe):
456
- 5. Design Electrical Rating (Net MWe):
436
- 6. Maximum Dependable Capacity (Gross MWe):
456
- 7. Maximum Dependable Capacity (Net MWe):
436
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N.A.
- 9. Power Level To Which Restricted, If Any (Net MWe):
N.A.
- 10. Reasons For Restrictions. If Any:
N.A.
This Month Yr-to-Date Cumulative
- 11. Hours In Reporting Period 744 3648 113,624.3
- 12. Number Of Hours Reactor Was Critical 0
1979.1 4611.4
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 0
1961.55 81,114.05
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 0 2,552,787 104,084,261
- 17. Gross Electrical Energy Generated (MWH) 0 855,000 35,526,434
- 18. Net Electrical Energy Generated (MWH) 0 816,676 33.664,042
- 19. Unit Service Factor 0
53.8 74.8
- 20. Unit Availability Factor 0
53.8 74.8
- 21. Unit Capacity Factor (Using MDC Net) 0 51.4 72.0
- 22. Unit Capacity Factor (Using DER Net) 0 51.4 72.0
- 23. Unit Forced Outage Rate 0
2.8 9.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
Routine refueling in progress
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
Jul y 1, 1980
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved N. A.
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION SCE Psso(,)
371 NEW 8/78 8006100/5 k
AVERAGE DAILY UNIT POWER LEVEL 50-206 DOCKET NO.
UNIT SONGS-1 DATE 6/9/80 COMPLETED BY J.M.JOY TELEPHONE (714) 492-7700 MONTH
- MAY, 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 0 0
0 17 2
0 is 0
3 0
19 0
4 0
20 0
5 0
1 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
lI 0
0 12 0
0 13 0
29 0
14 0
30 0
1s 0
31 0
16 0
PSSO(l) 371 NEW 8/78
DOCKE NO.
50- 206 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
_U__-_I UNIT NAME DATE 6/9780 MAY COMPLETED BY J.M.JOY TELEPHONE (714) 492-770(
.t Licensee Cause & Corrective Date Event Action to
-Report Prevent Recurrence 55 80-04-09 S
1257.7(
C 1
N.A.
ZZ ZZZZZ Refueling 3
4 F: Forced Reason:
Method:
Exhibit F Instructions S: Scheduled A-Equipment Failure (Explain)
! -Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report ([ER) File (NUREG D-Regulatory Restriction 4-Other (Explain) 0161
[-Operator Training & License Examiiation F-Administrative G-Operational Error (Explain)
Exhibit H-Same S)Urce S-nthei (tfxplaino PSSO(I) 371 NEW 8/78
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.
50-206 UNIT SONGS-1 DATE 6/9/80 COMPLETED BY J.M.JOY TELEPHONE (714) 492-7700 The unit was shutdown for refueling for the entire month.
Pssob()
371 NEW 8/78
REFUELING INFORMATION DOCKET NO.
50-206 UNIT SONGS-1 DATE 6/9/80 COMPLETED BY J.M.JOY TELEPHONE (714) 492-7700
- 1. Scheduled date for next refueling shutdown.
Not yet determined.
- 2. Scheduled date for restart following refueling.
July 1, 1980
- 3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Yes What will these be?
Proposed Change No. 88 to POL DPR-13, Appendix A, Technical Specification 3.5.2, Control Rod Insertion Limits.
- 4. Scheduled date for submitting proposed licensing action and supporting information.
February 8, 1980
- 5. Important licensing considerations associated with refueling, e.g.
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
None
- 6. The number of fuel assemblies.
a) In the core 157 b) In the spent fuel storage pool.
97
- 7. Licensed spent fuel storage capacity.
216 Intended change in spent fuel storage capacity.
None
- 8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
April 1983 PSSO(t) 371 NEW 8/78