AC40 - RA NRC MONTHLY OPERATING REPORT DOCKET NO.
50-206 DATE U
7 T COMPLETED BY P.- WattSn TELEPHONE
__14)4__-771 OPERATING STATUS
- 1. Unit Name:
San Onofre Nuclear Generating Station - Unit 1
- 2. Reporting Period:
February 1, 1980 to February 29, 1980 1347
- 3. Licensed Thermal Power (MWt):
4
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
436
- 6. Maximum Dependable Capacity (Gross MWe):
456
- 7. Maximum Dependable Capacity (Net MWe):
436
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
NA NA__
- 9. Power Level To Which Restricted, If Any (Net MWe):
NA
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 696 1,440 111,416.3
- 12. Number Of Hours Reactor Was Critical 469.3 1,037.4 83,669.7
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 457.2 1,022.1 80,174.6
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 559,989 1,310,865 102,842, 364
- 17. Gross Electrical Energy Generated (MWH) 189,000 436,200 35,107,634
- 18. Net Electrical Energy Generated (MWH) 180,014 416,205 33,263,571
- 19. Unit Service Factor 65.7 71.0 75.4
- 20. Unit Availability Factor 65.7 71.0 75.4
- 21. Unit Capacity Factor (Using MDC Net) 59.3 66.3 72.6
- 22. Unit Capacity Factor (Using DER Net) 59.3 66.3.
72.6
- 23. Unit Forced Outage Rate 1.75 4.29 9.22
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
Refueling April 11, 1980 -
74weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
NA
- 26. Units In Test Status (Prior to Commercial Operation):
NA Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION soozy3g180 5 CE Pssol:) 371 NEW 8/78
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-206 UNIT SONGS-1 DATE 03/07/80 COMPLETED BY P. Wattson TELEPHONE (714)492-7700 MONTH February DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 403 2
0 18 352 3
0 19 433 4
0 20 360 5
0 21 379 6
0 22 389 7
0 23 438 8
0 24 438 9
0 25 438 10 36 26 438 I1 312 436 12 277 28 437 3
95 437 434 NA 14 30 394 NA 16 406 PSSO()
371 NEW 8/78
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-206 UNIT NAME SONGS-1 DATE REPORTMONTH February COMPLETED BY P. Wattson TELEPHONE (714492-7700 Licensce Cause & Corrective No.
Date Event Action to Report Prevent Recurrence 43 01/26/80 S
141.3 H
1 NA ZZ ZZZZZZ TMI Modifications 44 02/01/80 S
230.8 H
1 NA ZZ ZZZZZZ TMI Modifications 45 02/11/80 F
41.1 A
5 NA HA TURBIN Low Governor Oil Pressure 46 02/12/80 F
8.0 A
1 NA HA TURBIN Repaired Governor Control Oil System 47 02/15/80 S
7.5 B
5 NA HC HTEXCH Clean Condenser Water Boxes 48 02/17/80 F
5.7 B
5 NA HC HTEXCH Repaired Salt Water Leaks by Plugging Condenser Tubes 49 02/18/80 S
12.0 B
5 NA HC HTEXCH Clean Condenser Water Boxes 50 02/19/80 S
6.8 B
5 NA HC HTEXCH Clean Condenser Water Boxes F: Forced Reason:
Method:
Exhibit F - Instiructioos S: Scheduled A-Equipment Failure (Explain)
!-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entrv Sheets for Licensee C-Refueling 3-Automatic Scram.
Even, Repot (LER) File (NUREG D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
Exhibit H-Smic Sonrce IEy-OShhi (Explain PSSo(1) 371 NEW 8/78
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-206 UNIT NAME 501465-1 DATE 03/07/80 February COMPLETED BY P. Wattson REPORTMONTH TELEPHONE (714)492-7700 C'
Licensee Cause & Corrective No.
Date Event 2.ction to Report -t c
Prevent Recurrence 51 02/20/80 S
5.5 B
5 NA HC HTEXCH Clean Condenser Water Boxes 52 02/20/80 S
7.7 B
5 NA HC HTEXCH Clean Condenser Water Boxes 53 02/21/80 S
8.5 B
5 NA HC HTEXCH Clean Condenser Water Boxes 3
4 F: Forced Reason:
Method:
Exhibit F Instructions S: Scheduled A-Equipment Failure (Explain)
!-Manual for Preparation otData B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Even Report (LER) File (NURLG D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
Exhibit H-Saic Smirce E
-b-I rc (ixplain)
Psso(h) 371 NEW 8/78
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.
50-206 UNIT SONGS-1 DATE 03/07/80 COMPLETED BY P. WATTSON TELEPHONE (714)492-7700 At the beginning of the month the unit was at cold shutdown with TMI modifications and general plant outage maintenance in progress.
On February 10 at 1040 the reactor was critical following the completion of outage projects. The unit went on line at 1450. Load increase was terminated at 2100 and 250 MWe gross due to low turbine governor oil pressure.
On February 12 at 2111 the unit was brought off the line to repair the governor oil pressure.
On February 13 at 0508 the unit went on line following the repair of the turbine control oil system. The unit reached full load at 1130.
On February 15 at 0343 unit load was reduced to 380 MWe gross to clean condenser inlet water boxes. The unit was returned to full load at 0620. At 2100 the unit load was reduced to 267 MWe gross to clean condenser inlet water boxes.
On February 16 at 0430, the unit was returned to full load.
On February 17 at 0615 the unit load was reduced to 300 MWe gross to repair a salt leak in the condenser and returned to full load at 1200.
On February 18 at 0105 the unit load was reduced to 300 MWe to clean condenser inlet water boxes. The unit was returned to full load at 1305.
On February 19 at 2345 the unit load was reduced to 300 MWe to clean condenser inlet water boxes. The unit was returned to full load on February 20 at 0635.
On February 20 at 1200 the unit load was reduced to 300 MWe gross to clean south condenser inlet water boxes. The unit was returned to full load at 1730.
At 2200 the unit load was reduced to 300 MWe gross to clean condenser inlet water boxes.
On February 21 at 0543 the unit was returned to full load. At 2200 the unit load was reduced to 300 MWe gross to clean condenser inlet water boxes.
On February 22 the unit was returned to full load.
At the end of the month the unit remained at full load.
Psso(1) 371 NEW 8/78 L
REFUELING INFORMATION DOCKET NO.
50-206 UNIT SONGS-1 DATE 03/07/80 COMPLETED BY. P..WATTSON TELEPHONE (714)492-7700
- 1. Scheduled date for next refueling shutdown.
April 1980
- 2. Scheduled date for restart following refueling.
June 1980
- 3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
No changes expected at this date.
What will these be?
NA
- 4. Scheduled date for submitting proposed.licensing action and supporting information.
NA
- 5. Important licensing considerations associated with refueling, e.g.
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
None.
- 6. The number of fuel assemblies.
a) In the core 157 b) In the spent fuel storage pool.
51
- 7. Licensed spent fuel storage capacity.
216 Intended change in spent fuel storage capacity.
None
- 8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
April 1983 PSSO(i) 371 NEW 8/78