Requests Initiation of Proceedings to Revoke or Suspend Ol,Per 10CFR2.206.Seismic Design Criteria & Local Emergency Evacuation Plan Inadequate
ML13311A993
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 11/12/1979
From: Iverson T
AFFILIATION NOT ASSIGNED
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 7911160519
Download: ML13311A993 (1)


Text

REQUEST FOR INSTITUTION OF PROEEDINGS TO REVOKE OPERATING LICENSE, 10 CFR 2.206 TO:

Director of Nuclear Reactor Pegulation United States Nuclear Regulatory Cariission As a concerned and interested resident of Southern Ca fornia, who my be adversely affected by the unit's continued coerating, I

,yi g4

, request the Director of Nuclear Reactor Regulation to initiate roceeding pursuant to 10 CFR 2.202 and 10 CFR 55.40 for the purpose of suspending or oking the operating license for the San Onofre Nuclear Generating Station Unit One.

New and relevant information is now available on potential ground notions at the site in the event of an earthquake, and this information would have warranted the Cannission to have refused to grant a license on the original application.

Furthermore, the plant is located midway between Los Angeles and San Diego, one of the most densely populated and fastest growing areas in the country.

Unit I is not designed to withstand possible ground motions fron earthquakes on the Newport-Inglewood and Christianitos faults and their branches which pass close to the reactor.

These ground motions could: break cooling water pipes, cause a loss of coolant accident, and lead to a meltdown of the fuel rods.

The addition of a concrete shell to the reactor dome and other modifications are inadequate to insure against damages fran possible ground motions during a maximum possible earthquake.

The new and relevant information regarding ground motion potential was unavailable when the ABC approved the design criteria of Unit I or later when the NR approved structural changes to the unit.

Seismic design criteria for Unit I was based on inadequate.data on measurements of ground motions close to the source of the earthquakes.

Recent California earthquakes near Santa Barbara in August, 1978, near San Jose in August, 1979, and in Imperial Valley in October, 1979, have revealed new and relevant information about ground motions that was not available to the NRC for determining seismic design criteria for Unit I.

Because population growth near the San Onofre plant has been more rapid and ex tensive than could have been anticipated during the licensing of Unit I, there are no adequate evacuation plans for the area' s residents in the event of a loss of coolant accident.

Approximately nine million people live in the area that could be affected by the accidental release of radioactive gases fron Unit I.

The State and local govern ments are not prepared to evacuate the population within the short time between the accident and the spread of radioactive gases.

When the ABC issued the construction permit in March of 1964, it was impossible to know the population of the region whould increase so rapidly.

For the above reasons, and the associated risks to the health and safety of the people of Southern California, it is imperative that you take action to suspend or revoke the operating license for San Onofre Nuclear Generat' g Station nit I Signed on this date, 7777 /

1979.

1t gnature)

(-.reet address)

(city, gtate, ip code) 7911 160S /e i