21 Southern California Edison Company P. 0. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD. CALIFORNIA 91770 M.O. MEDFORD TELEPHONE MANAGER. NUCLEAR LICENSING April 16, 1984 (213) 572-1749 Director, Office of Nuclear Reactor Regulation Attention: D. M. Crutchfield, Chief Operating Reactors Branch No. 5 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Gentlemen:
Subject:
Docket No. 50-206 TMI Action Item II.K.3.5, "Automatic Trip of Reactor Coolant Pumps" San Onofre Nuclear Generating Station Unit 1
References:
- 1. Letter, D. G. Eisenhut, NRC, to All Licensees with Westinghouse (W) Designed Nuclear Steam Supply Systems (NSSS), Resolution of TMI Action Item II.K.3.5, "Automatic Trip of Reactor Coolant Pumps" (Generic Letter No.83-10d),
February 8, 1983
- 2. Letter, R. W. Krieger, SCE, to D. M. Crutchfield, NRC, TMI Action Item II.K.3.5, "Automatic Trip of Reactor Coolant Pumps," May 10, 1983
- 3. Letter, K. P. Baskin, SCE, to H. R. Denton, NRC, Integrated Living Schedule, February 27, 1984
- 4. Letter, D. G. Eisenhut, NRC, to K. P. Baskin, SCE, Southern California Edison Company's Revised Proposal for an Integrated Living Schedule, March 29, 1984 Reference 1 forwarded the results of the NRC staff evaluation of the subject TMI Action Plan Item. The evaluation concluded that the need for reactor coolant pump (RCP) trip, following a transient or accident, should be determined by each licensee on a case-by-case basis, considering Owners Group Input. We indicated in Reference 2 that a schedule for resolution of the San Onofre Unit 1 RCP trip issue would be provided after the completion of the Westinghouse Owner's Group (WOG) generic work. Since the WOG generic work has been completed and reported to the NRC, the schedule for completion of the RCP trip evaluation for San Onofre Unit 1 is provided.
C-I-IR 0027iB O46~
13046 0
_5000206L D
ADCKMR
Mr. D.
April 16, 1984 Reference 3 provided you with the revised Integrated Living Schedule (ILS) for San Onofre Unit 1. As indicated in Enclosure 1 to Reference 3, the evaluation necessary to resolve the RCP trip issue for San Onofre Unit 1 will be completed prior to return to service from the Cycle 9 refueling outage.
The current schedule for startup from Cycle 9, indicated in Enclosure 2 to Reference 3, is July 1, 1986. Reference 4 provided the results of the NRC review of the revised ILS and indicated general acceptance thereof.
If you have any questions regarding the above discussed schedule, please let me know.
Very truly yours,