ML13310B149
| ML13310B149 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 01/19/1984 |
| From: | Medford M SOUTHERN CALIFORNIA EDISON CO. |
| To: | Crutchfield D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML13310B151 | List: |
| References | |
| TASK-***, TASK-RR NUDOCS 8401240147 | |
| Download: ML13310B149 (1) | |
Text
Southern California Edison Company P. 0. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD. CALIFORNIA 91770 M.O. MEDFORD TELEPHONE MANAGER, NUCLEAR LICENSING January 19, 1984 (213) 572-1749 Director, Office of Nuclear Reactor Regulation Attention: D. M. Crutchfield, Chief Operating Reactors Branch No. 5 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:
Subject:
Docket 50-206 Systematic Evaluation Program Integrated Assessment San Onofre Nuclear Generating Station Unit 1
References:
A. Letter, D. M. Crutchfield, NRC, to R. Dietch, SCE, dated February 7, 1983 B. Letter, K. P. Baskin, SCE, to 0. M. Crutchfield, NRC, dated June 13, 1983 Reference A provided a summary of the unresolved differences resulting from the Systematic Evaluation Program Review. Reference B indicated that SCE would provide responses to each of the open items, including any proposed corrective actions by the end of the year 1983. The purpose of this letter is to provide the results of SCE's review of these topics and to indicate where additional information resolves the topic, where modif' P-'on or further analysis is deemed necessary or where the issue has been/
/ated for its contribution to risk and determined to not warrant any modi-ions. provides SCE's responses to the open items as sum d in Reference A. Enclosure 2 is a copy of Engineering Procedure SOlq01 17, Reactor Coolant Pump.Flywheel Inspection, submitted as part of the re to Topic III-10.B, Pump Flywheel Integrity.
If you have any questions regarding these responses or require any ac, anal information, please let me know.
0 Very truly yours, Enclosre K
sPYR P
Enclosures
/3