Clarifies 831128 Response to Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events. Reactor Trip Breaker Maint Will Be Refined & Enhanced as Necessary,Per IE Bulletin 83-01
ML13310B148
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 01/12/1984
From: Medford M
Southern California Edison Co
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
GL-83-028, REF-SSINS-6820 IEB-83-01, IEB-83-1, NUDOCS 8401200219
Download: ML13310B148 (2)


Text

Southern California Edison Company P. 0. BOX 800 2244WALNUTGROVEAVENUE ROSEMEAD, CALIFORNIA 91770 M.O. MEDFORD TELEPHONE MANAGER, NUCLEAR LICENSING (213) 572-1749 January 12, 1984 Director, Office of 'Nuclear Reactor Regulation Attention: 0. M. Crutchfield, Chief Operating Reactors Branch No. 5 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:

Subject:

Docket No. 50-206 Generic Letter 83-28:

Required Actions Based on Generic Implications of Salem ATWS Events San Onofre Nuclear Generating Station Unit 1

Reference:

November 28, 1983 letter from M. 0. Medford to D. M. Crutchfield concerning the same subject The current status of our conformance with Generic Letter 83-28, and our plans and schedules to achieve full conformance, were provided in the reference. The purpose of this letter is to clarify our responses in the reference to Generic Letter 83-28 Positions 3.1, 4.2 and 4.5.

Our responses to Positions 3.1, 4.2 and 4.5 provided information concerning the San Onofre Unit 1 reactor trip breaker maintenance program. As discussed in these responses, the maintenance program was revised based on Westinghouse Technical Bulletin 83-02 in accordance with IE Bulletin 83-01.

By transmittal dated September 13, 1983, Westinghouse superceded the original version of Technical Bulletin 83-02 with Revision 1. In accordance with normal station practice, a review of Westinghouse Technical Bulletin 83-02 Revision 1 was initiated to determine the appropriate station response.

However, since this review was being conducted independently from our efforts related to Generic Letter 83-28, the reference does not address our review of Technical Bulletin 83-02 Revision 1. We would like to clarify that although at the time the reference was submitted the maintenance program was based on the original version of Technical Bulletin 83-02, we expect to refine and enhance reactor trip breaker maintenance as necessary, particularly in the 9401200219 840112 0

PDR ADOCK 05000206 P

PDR

Mr. D.

January 12, 1984 near term as information from Westinghouse and the Westinghouse Owners Group is received. Therefore, our responses in the reference should be interpreted to indicate the status of the maintenance program at that point in time, rather than to indicate the final program.

Please call me if you have any questions or require additional information.

Subscribed on this 12th day of January

, 1984.

Respectfully submitted, SOUTHERN CALIFORNIA EDISON COMPANY By:

M. 0. Medford Manager, Nuclear Licensing Subscribed and sworn o before me this

/