ML13310B129

From kanterella
Jump to navigation Jump to search
Forwards Seismic Reevaluation Program,Return to Svc Plan San Onofre Unit 1. NRC Concurrence Re Application of Criteria Requested as Soon as Possible
ML13310B129
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 12/23/1983
From: Medford M
Southern California Edison Co
To: Crutchfield D
Office of Nuclear Reactor Regulation
Shared Package
ML13310B131 List:
References
NUDOCS 8312290390
Download: ML13310B129 (1)


Text

Southern California Edison Company P. 0.

BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD. CALIFORNIA 91770 M.O. MEDFORD TELEPHONE MANAGER, NUCLEAR LICENSING (213) 572-1749 December 23, 1983 Director, Office of Nuclear Reactor Regulation Attention: 0. M. Crutchfield, Chief Operating Reactors Branch No. 5 Division of Licenstng U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:

Subject:

- Docket No. 50-206 Return to Service Plan Seismic Reevaluation Program San Onofre Nuclear Generating Station Unit 1 Over the last several months, we have met with NRC management and NRC staff personnel to discuss a return to service plan for the seismic reevaluation program. As discussed in these meetings, the basic premise of this plan is that all San Onofre Unit 1 structures and systems whose failure could cause an accident and/or whose function is required to get to and maintain a safe shutdown (hot standby, Mode 3) will be available following a 0.67g earthquake.

The details of the return to service plan are provided in the enclosed report. Based on the implementation of this plan, San Onofre Unit 1 can return to power without undue risk to the health and safety of the public even considering the possibility of a major earthquake at the plant site.

As discussed in our previous meetings, it is necessary that SCE obtain agreement with the NRC staff on the criteria to be applied to the seismic reevaluation program for return to service by mid-January 1984. As such, it is imperative that any questions you may have regarding our intentions in the enclosed plan be resolved as soon as possible. If there is anything that we can do to facilitate the NRC staff review, we will be pleased to provide additional information and/or meet with you as appropriate.

If you have any questions or comments on the enclosed plan, please contact me as soon as possible.

Very truly yours, 9312290390 831223 PDR ADOCK 05000206 P

PDR