Forwards Responses to Issues Raised in 830502-04 Meetings Re SEP Topic III-6 Concerning Seismic Design Considerations. Addl Info Requested at 830502-04 Meetings Will Be Provided by 830610
ML13310A781
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 05/23/1983
From: Baskin K
Southern California Edison Co
To: Crutchfield D
Office of Nuclear Reactor Regulation
Shared Package
ML13310A782 List:
References
TASK-03-06, TASK-3-6, TASK-RR NUDOCS 8305250512
Download: ML13310A781 (2)


Text

Southern California Edison Company P. 0. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD, CALIFORNIA 91770 K. P. BASKIN TELEPHONE MANAGER OF NUCLEAR ENGINEERING.

May 23, 1983 (2 13)57-1o SAFETY, AND LICENSING Director, Office of Nuclear Reactor Regulation Attention:

Mr. D. M. Crutchfield, Chief Operating Reactors Branch No. 5 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Gentlemen:

Subject:

Docket No. 50-206 SEP Topic 111-6 Seismic.-Design.Considerations San Onofre Nuclear Generating Station Unit 1 On December 1-3, 1982 SCE and its consultants met with the NRC to discuss a number of issues related to the seismic reevaluation of San Onofre Unit 1. Open items from that meeting were summarized in a memorandum from William T. Russell to Frank J. Miraglia dated December 29, 1982.

SCE's responses to these items were discussed with the NRC in meetings on May 2-4, 1983.

The purpose of this letter is to document those responses.

As summarized in Mr. Russell's memorandum, three major issues remained open after the December 3 meeting. Responses to these three issues are provided in Enclosure I. A number of additional open items were discussed in Enclosure 2 to Mr. Russell's memorandum. Responses are provided in Enclosure II to all of these items except for items 4 and 14 and additional information required for item 5. In addition, specific aspects of the response to issue 2 which relate to item 4 are not included in the enclosed response. This information will be provided by June 10, 1983. Revised criteria for the Balance of Plant Mechanical Equipment and Piping Seismic Reevaluation Program are provided in Enclosure III.

In addition to the items from Mr. Russell's December 29, 1982 memorandum, several other topics were discussed at the May 2, 3 and 4 meetings. As a result of these discussions, information is also required regarding (1) the structural integrity of the spent fuel pool, (2) interfaces 8305250512 930523 PDR ADOCK 05000206 P

PDR

Mr. D.

May 23, 1983 between non-safety related and safety related piping, and (3) the structural adequacy of electrical cabinets. This information will be provided by June 10, 1983.

If you have any questions on any of this information, please let us know.

Very truly yours, cc:

T. Bridges (EG&G, Idaho)