ML13309A760

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 790701-31
ML13309A760
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 09/06/1979
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML13309A751 List:
References
50-361-79-20, 50-362-79-20, NUDOCS 7911050524
Download: ML13309A760 (1)


Text

APPENDIX A Southern California Edison Company P. 0. Box 800 Rosemead, California 91770 Docket Nos. 50-361 and 50-362 Construction Permit Nos. CPPR-97 and CPPR-98 Notice of Violation Based on the results of an NRC inspection conducted on July 1-31, 1979, it appears that one of your activities was not conducted.in full com pliance with conditions of your NRC Construction Permit Nos. CPPR-97 and CPPR-98 as indicated below:

Appendix B of 10 CFR 50, Criterion V, states in part that, "Activities affecting quality shall be prescribed by documented instructions..

and shall be accomplished in accordance with these instructions...

Appendix A to the PSAR commits to comply with the requirements of 10 CFR 50, Appendix B.

Contrary to the above, a craftsman was observed cutting a section of stainless steel pipe for the safety injection system (Spool.52 SI-045-1) on July 19, 1979 with a grinding disc that was not identified as a disc to be used only on stainless steel.

This is contrary to the construction procedure WPP/QCI 206, Revision 4 which states "Grinding wheels, disc and wire wheels to be used on stainless steel or nickel base alloys shall be color coded by the tool room attendant or the warehouse personnel with a white metal marker.

This is a deficiency.