Text
ACCELERATED DISTRIBUTION DEMONSTTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9205180249 DOC.DATE: 92/05/15 NOTARIZED: NO DOCKET #
FACIL:50-206 San Onofre Nuclear Station, Unit 1, Southern Californ 05000206 AUTH.NAME AUTHOR AFFILIATION ROSENBLUM,R.M.
Southern California Edison Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
R
SUBJECT:
Advises that response to Generic Ltr 92-01, "Reactor Vessel Structural Integrity" will not be submitted at present time based on util plans to permanently shutdown facility.
D DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR L ENCL SIZE:
S TITLE: OR Submittal: General Distribution NOTES:License Exp date in accordance with 10CFR2,2.109 ; PDNP PD ; 05000206 PDNP LA ; DUDLEY,R. ; MOULTON,J.
A RECIPIENT COPIES RECIPIENT COPIES D
ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1
PD5 PD 1
D KALMAN,G 2
S INTERNAL: ACRS 6
NRR/DET/ECMB 7D 1
NRR/DET/ESGB 1
NRR/DOEA/OTSB11 1
NRR/DST 8E2 1
NRR/DST/SELB 7E 1
NRR/DST/SICB8H7 1
NRR/DST/SRXB 8E 1
NUDOCS-ABSTRACT 1
OC/LFMB-1 OGC/HDS3 1
REFIL 0lz 1
RES/DSIR/EIB 1
EXTERNAL: NRC PDR 1
NSIC 1
NOTES:
4 R
I D
S A
D D
NOTE TO ALL "RIDS" RECIPIENTS:
S PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 28 ENCL
--24e
Southern California Edison Company 23 PARKER STREET IRVINE, CALIFORNIA 92718 R. M. ROSENBLUM TELEPHONE MANAGER OF (714) 454-4505 NUCLEAR REGULATORY AFFAIRS May 15, 1992 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Gentlemen:
Subject:
Docket No. 50-206 Deferment of Unit 1 Generic Letter 92-01 Response San Onofre Nuclear Generating Station Unit 1 Generic Letter (GL) 92-01, "Reactor Vessel Structural Integrity," Revision 1, was issued on March 6, 1992.
The generic letter requested information to allow the NRC Staff to assess compliance with reactor vessel structural integrity requirements and commitments. On April 13, 1992, SCE contacted Mr. George Kalman, Senior Project Manager for San Onofre Unit 1 in the Office of Nuclear Reactor Regulation (NRR), to discuss the request and the planned permanent shutdown of Unit 1.
SCE requested to defer the response to GL 92-01 for Unit 1. The basis for the request is that reactor vessel structural integrity considerations are long term operating issues, and a permanent shutdown of Unit 1 is currently planned. Mr. Kalman agreed that SCE need not submit a response to GL 92-01 for Unit 1 at this time. SCE agreed that if the unit were to operate beyond the current cycle, a detailed response to GL 92-01 would be submitted before the Cycle 12 startup. Therefore, a response to GL 92-01 for San Onofre Unit 1 will not be submitted at this time.
If you have questions or require any further information, please let me know.
Very truly yours, cc:
J. B. Martin, Regional Administrator, NRC Region V George Kalman, NRC Senior Project Manager, San Onofre Unit 1 J. 0. Bradfute, NRC Project Manager, San Onofre Unit 1 C. W. Caldwell, NRC Senior Resident Inspector, San Onofre Units 1, 2&3 4A 0~
9205180249 920515 PDR ADOCK 05000206 P