Forwards Rev 6 to San Onofre Design Basis & Reconstitution Plan, Addressing 10CFR50,App R/Safe Shutdown Topical DBA & Inservice Testing Topical DBA for Units 2 & 3.W/o Encl
ML13309A201
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 03/26/1992
From: Ornelas R
Southern California Edison Co
To:
NRC/IRM
Shared Package
ML13309A202 List:
References
NUDOCS 9203300095
Download: ML13309A201 (2)


Text

.-

C _1 Southern California Edison Company 23 PARKER STREET IRVINE, CALIFORNIA 92718 R. ORNELAS March 26, 1992 TELEPHONE PLANT LICENSING MANAGER (714) 454-4550 SAN ONOFRE NUCLEAR GENERATING STATION U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 200555 Gentlemen:

Subject:

Docket Nos. 50-206, 50-361, and 50-362 Design Bases Documentation and Reconstitution Plan San Onofre Nuclear Generating Station Units 1, 2, and 3

Reference:

Letter from R. M. Rosenblum (SCE) to the Document Control Desk, dated March 11, 1991;

Subject:

Design Bases Documentation and Reconstitution Plan San Onofre Nuclear Generating Station Units 1, 2, and 3 To continue to inform the NRC of our design bases documentation progress and plans, this letter transmits to you Southern California Edison's "San Onofre Design Bases and Reconstitution Plan," Revision 6. The purpose of this plan is to outline our program to retrieve, assess, reconstruct (as required),

confirm, and document San Onofre nuclear power plant design bases in a series of Design Bases Documents. The intent of the program is to establish and document the rationale for the design bases.

As discussed in our March 11, 1991, letter, we had anticipated that lesson learned revisions would be required.

Accordingly, the enclosed plan supersedes the information included in Revision 5 provided to you by the above reference. Fewer updates to the Design Basis Documentation (DBD) Plan are anticipated in the future. Consequently, we do not plan to issue an annual update to the NRC but will notify the NRC of significant changes to our plan on an as needed basis.

The major plan changes made in Revision 6 are:

  • A 10CFR50 Appendix R/Safe Shutdown Topical DBD and an In-Service Testing (IST) Topical DBD for Units 2 and 3 have been added to the DBD Program Scope. Refer to Appendix A of the enclosure for schedule detail.

9203300095 920326 PDR ADOCK 05000206 P

PDR

Document Control Desk

-2

  • As a result of the decision to retire San Onofre Unit 1 (501), no other SO1-DBDs are planned. However, 7 S01-DBDs were issued in 1990/91 on important system and topical areas. Refer to Appendix A of the enclosure.
  • Two new sections were added to the DBD plan,Section X "DBD Orientation" and Section XI "Assessments."

If you have any questions, please call me.

Very truly yours, C:\\NETWP51\\TWR\\DBDFIL.'92:JW Enclosure cc: J. B. Martin, Regional Administrator, NRC Region V George Kalman, NRC Senior Project Manager, San Onofre Unit 1, 2&3 J. 0. Bradfute, NRC Project Manager, San Onofre Unit 1 C. W. Caldwell, NRC Senior Resident Inspector, San Onofre Units 1, 2&3