Requests Review of Existing Commitments & Ongoing Licensing Actions Associated W/Facility & Proposes Appropriate Disposition of Issues Commensurate W/Shortened Operational Life of Plant
ML13309A190
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 02/21/1992
From: Murley T
Office of Nuclear Reactor Regulation
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
References
NUDOCS 9202280094
Download: ML13309A190 (5)


Text

  • \\,1 RE G&

o UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 February 21, 1992 Docket No. 50-206 Mr. Harold B. Ray Senior Vice President Southern California Edison Company Irvine Operations Center 23 Parker Street Irvine, California 92718

Dear Mr. Ray:

SUBJECT:

CLOSURE OF SAN ONOFRE NUCLEAR GENERATING STATION UNIT 1 Thank you for keeping us informed of the ongoing California Public Utility Commission's proceedings that may affect the future operations at San Onofre Nuclear Generating Station, Unit 1. Based on.your correspondence and our discussions with your staff, it appears that a permanent closure of Unit 1 is likely to occur later this year or In mid-1993. If plant closure proceeds as projected, the NRC staff is prepared to respond to related licensing issues to close the plant safely, in compliance with Federal regulations applicable to nuclear plant closure and decommissioning.

We have evaluated existing issues related to the proposed closure of Unit 1 and have the following observations. Your letter dated January 15, 1992, proposed to extend the existing Unit 1 reactor fuel cycle by performing a "mid-cycle fuel shuffle". You propose to exchange fuel from the reactor with partially expended fuel in the spent fuel pool.

You state this process would extend the current operating cycle by approximately 6 months. This proposed fuel exchange appears to include all the operations and related safety concerns associated with a reactor refueling. The proposed fuel exchange would be performed at the approximate time identified as the cycle 12 refueling outage by the Confirmatory Order that was issued to the Southern California Edison Company on January 2, 1990. In terms of regulatory requirements, we view the "mid-cycle fuel shuffle" as a reactor refueling that would trigger the requirement to perform the cycle 12 projects as identified by our Confirmatory Order.

We recognize that you desire to operate through the peak electrical load demands during the summer of 1993 before permanently closing the reactor.

However, to do so, you need to either comply with the requirements of the January 2, 1990, Confirmatory Order or evaluate the safety consequences of extending reactor operations without upgrading the plant. If your evaluation concludes that extended operations can continue yet provide reasonable assurance to the protection of the public health and safety, you may seek a license amendment which would modify the conditions of the Confirmatory Order.

9202260094 920221 K

PDR ADOCK 05000206 P

PDR

,C EC m

CP

Mr. Harold B. Ray

-2 As a separate action, we request that you review existing commitments and ongoing licensing actions associated with Unit 1 and propose an appropriate disposition of these issues commensurate with the shortened operational life of the plant. I recognize that key decisions affecting Unit 1's future have not been finalized by you and the California Public Utitlities Commission.

However, my intent in sending this letter is to clarify the Unit 1 related regulatory issues and to provide you with time to take any contemplated action.

Sincerely, homas E.

rle', 1ector Office of Nuclear Reactor Regulation cc:

See next page

Mr. Harold B. Ray San Onofre Nuclear Generating Southern California Edison Company Station, Unit No. 1 cc:

Mr. Phil Johnson Mr. Richard J. Kosiba, Project Manager U.S. Nuclear Regulatory Commission Bechtel Power Corporation Region V 12440 E. Imperial Highway 1450 Maria Lane, Suite 210 Norwalk, California 90650 Walnut Creek, California 94596 Mr. Robert G. Lacy Manager, Nuclear Department San Diego Gas & Electric Company P. 0. Box 1831 San Diego, California 92112 Resident Inspector/San Onofre NPS c/o U.S. Nuclear Regulatory Commission P. 0. Box 4329 San Clemente, California 92674 Mayor City of San Clemente 100 Avenida Presidio San Clemente, California 92672 Chairman, Board of Supervisors County of San Diego 1600 Pacific Highway, Room 335 San Diego, California 92101 Regional Administrator, Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Mr. John Hickman Senior Health Physicist Environmental Radioactive Mgmt. Unit Environmental Management Branch State Department of Health Services 714 P Street, Room 616 Sacramento, California 95814 Mr. Don J. Womeldorf Chief, Environmental Management Branch California Department of Health Services 714 P Street, Room 616 Sacramento, California 95814

Mr. Harold B. Ray

-2 As a separate action, we request that you review existing commitments and ongoing licensing actions associated with Unit 1 and propose an appropriate disposition of these issues commensurate with the shortened operational life of the plant. I recognize that key decisions affecting Unit 1's future have not been finalized by you and the California Public Utitlities Commission.

However, my intent in sending this letter is to clarify the Unit 1 related regalatory issues and to provide you with time to take any contemplated action.

Sincerely, (original signed by F.M. Miraglia)

Thomas E. Murley, Director Office of Nuclear Reactor Regulation cc:

See next page DISTRIBUTION:

Docket File JBradfute NRC Local PDR's OGC(15B18)

PDV R/F ACRS(10)(P315)

BBoger PDV P/F MVirgilio RZimmerman, Region V TQuay JPartlow DFoster TMurley GKalman

  • See previous concurrence OFC
PDV/LA PDV/PE
PDV/PM
TECH EDITOR NAME
DFoste J radfute man
JMain
lMFinkelstein DATE

,-//8 92

g/r4/ 92 VA P92
02/10/92
02/11/92 OFC
PDV/D
AD45/NRR D/DRPW
ADP/N R
D/N NAME lfQuay MVirgilioMO4V BBoger 1$/

JPartl1-y DATE ' }f

/92 l

t

//92 lo/1192

/ /920

/ /92 OFFICIAL RECORD COPY Document Name:

SO1LTR

Mr. Harold B. Ray

-2 However, the actions addressed in this letter will require considerable lead time to complete. My intent in raising these issues, is to clarify, in advance, the ground rules for continued operation of Unit 1.

Sincerely, Thomas E. Murley, Director Office of Nuclear Reactor Regulation cc:

See next page DISTRIBUTION:

Docket File NRC Local PDR's PDV R/F BBoger MVirgilio TQuay DFoster GKalman JBradfute OGC(15B18)

ACRS(10)(P315)

PDV P/F RZimmerman, Region V JPartlow TMurley OFC

PDV/LA PDV/PE DV TECH EDITOR OGC NAME DFoster iira fuI4) 4n

,92 DATE

//0/92

1o /fb/ 92 0 /92

/92

////92 OFC PDV/D AD45/NRR

D/DRPW
ADP/NRR
D/NRR NAME TQuay MVirgilio BBoger
JPartlow TMurley DATE

/

/92

/

/92

/

/92

//92

/92 OFFICIAL RECORD COPY Document Name:

S01LTR