Concurs That Configuration Proposed in for Testing Safety Injection Pumps Is Adequate & May Be Used to Meet Requirements of Inservice Testing Program
ML13309A158
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 12/23/1991
From: Kalman G
Office of Nuclear Reactor Regulation
To: Ray H
Southern California Edison Co
References
GL-89-004 NUDOCS 9201060110
Download: ML13309A158 (3)


Text

December 23, 1991 Docket No. 50-206 DISTRIBUTION:

Docet Te NRC/Local PDRs Mr. Harold B. Ray BBoger MVirgilio Senior Vice President P.&&poZ)Fcswr GKalman Southern California Edison Company JBradfute OGC(15B18)

Irvine Operations Center Edordan(3701) ACRS(1O)(P315) 23 Parker Street PDV p/f PDV r/f Irvine, California 92718 RZimmerman,RV

Dear Mr. Ray:

SUBJECT:

INSERVICE TESTING OF SAFETY INJECTION PUMPS AT SAN ONOFRE UNIT 1 Your letter dated October 4. 1991, proposed a change to a previously described modification of the San Onofre Unit 1 safety injection system. The original safety injection system modification was described in an inservice testing (IST) program relief request that was submitted by the Southern California Edison Company (SCE) on October 29, 1990.

The proposed modification consisted of the addition of flow test loops for testing the safety injection pumps.

The IST relief request, granted by NRC on December 19, 1990, authorized continued operation of the plant with a modified safety injection pump IST program until refueling outage 12. During refueling outage 12, SCE would add the test loops and commence a safety injection system IST program that fully complies with regulatory requirements.

The October 4, 1991, letter proposed to add flowmeters to the existing miniflow lines in the safety injection system rather than adding the separate test loops to meet the IST testing requirements. Either modification will enable the safety injection pumps to be tested in accordance with ASME Code require ments and in accordance with the NRC position as outlined in Generic Letter 89-04. We, therefore, concur that the configuration proposed in your October 4, 1991, letter for testing the safety injection pumps is adequate and may be used to meet the requirements of the IST program. The interim relief from the safety injection pump IST program, as granted by our letter dated December 19, 1990, remains in effect until refueling outage 12.

Sincerely, Original tigned bY George Kalman, Senior Project Manager Project Directorate V Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation cc:

See next page OFC

PDV/LA
PRV/RE
PD M
EMEB
PDV/D NAME R

GK a

TQuay DATE :1f

/1/91

6 /W//91
"ZA21/91
A///r-/91
\\2-/i2./91 OFFICIAL RECORD COPY Document Name:

501 ITSIP, 9201060110 911223 PDR ADOCK 05000206 P

PDR

REG,,,

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 December 23, 1991 Docket No. 50-206 Mr. Harold B. Ray Senior Vice President Southern California Edison Company Irvine Operations Center 23 Parker Street Irvine, California 92718

Dear Mr. Ray:

SUBJECT:

INSERVICE TESTING OF SAFETY INJECTION PUMPS AT SAN ONOFRE UNIT I Your letter dated October 4, 1991, proposed a change to a previously described modification of the San Onofre Unit 1 safety injectior system. The original safety injection system modification was described in an inservice testing (IST) program relief request that was submitted by the Southern California Edison Company (SCE) on October 29, 1990.

The proposed modification consisted of the addition of flow test loops for testing the safety injection pumps.

The IST relief request, granted by NRC on December 19, 1990, authorized continued operation of the plant with a modified safety injection pump IST program until refueling outage 12.

During refueling outage 12, SCE would add the test loops and commence a safety injection system IST program that fully complies with regulatory requirements.

The October 4, 1991, letter proposed to add flowmeters to the existing miniflow lines in the safety injection system rather than adding the separate test loops to meet the IST testing requirements.

Either modification will enable the safety injection pumps to be tested in accordance with ASME Code require ments and in accordance with the NRC position as outlined in Generic Letter 89-04.

We, therefore, concur that the configuration proposed in your October 4, 1991, letter for testing the safety injection pumps is adequate and may be used to meet the requirements of the IST program. The interim relief from the safety injection pump IST program, as granted by our leti r dated December 19, 1990, remains in effect until refueling outage 12.

Sincerely, George Ka man, Senior Project Manager Project Directorate V Division of Reactor Projects III/IV/V Office of Nuclear Reactor Pegulation cc:

See next page

fir. Harold B. Ray San Onofre Nuclear Generating Southern California Edison Company Station, Unit No. 1 cc:

Mr. Phil Johnson Mr. Richard J. Kosiba, Project Manager U.S. Nuclear Regulatory Commission Bechtel Power Corporation Region V 12440 E. Imperial Highway 1450 Maria Lane, Suite 210 Norwalk, California 90650 Walnut Creek, California 94596 Mr. Robert G. Lacy Manager, Nuclear Department San Diego Gas & Electric Company P. 0. Box 1831 San Diego, California 92112 Resident Inspector/San Onofre NPS c/o U.S. Nuclear Regulatory Commission P. 0. Box 4329 San Clemente, California 92674 Mayor City of San Clemente 100 Avenida Presidio San Clemente, California 92672 Chairman, Board of Supervisors County of San Diego 1600 Pacific Highway, Room 335 San Diego, California 92101 Regional Administrator, Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 1r. John Hickman Senior Health Physicist Environmental Radioactive Mgmt. Unit Environmental Management Branch State Department of Health Services 714 P Street, Room 616 Sacramento, California 95814 Mr. Don J. Womeldorf Chief, Environmental Management Branch California Department of Health Services 714 P Street, Room 616 Sacramento, California 95814