REG1, UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055 September 26, 1991 Docket No. 50-206 Mr. Harold B. Ray Senior Vice President Southern California Edison Company Irvine Operations Center 23 Parker Street Irvine, California 92718
Dear Mr. Ray:
SUBJECT:
SAN ONOFRE UNIT 1 FULL-TERM OPERATING LICENSE (TAC NO. 11232)
In response to a July 28, 1970 application by the Southern California Edison Company and the San Diego Gas and Electric Company to convert the San Onofre Nuclear Generating Station Unit 1 provisional operating license to a full-term operating license, the Commission has issued the enclosed Facility Operating License No. DPR-13. The license authorizes operation of the Unit 1 reactor at steady-state power levels not to exceed 1347 megawatts-thermal. The full-term operating license expires at midnight on March 2, 2004.
San Onofre Nuclear Generating Station Unit 1 operation was authorized on March 27, 1967 by Provisional Operating License DPR-13. Facility Operating License DPR-13 supersedes Provisional Operating License DPR-13 in its entirety. All orders issued under the provisional operating license remain in effect under Facility Operating License DPR-13.
The full-term license has been reformatted, as necessary, to achieve consis tency with the language and format used in contemporary licenses. Certain requirements have been deleted from the license itself because they have been incorporated into the Technical Specifications or they are no longer applicable.
Specifically, license conditions 3.D, 3.E, 3.F, 3.H, 3.1, 3.K, and 3.L in the provisional license were deleted from the full-term license. License Condition C. (8) incorporating the provisions of the Confirmatory Order issued by the NRC on January 2, 1990, was ded to the license. Appendix A of the license, the Technical Specifications, has not been altered.
The Technical Specifications contained in Appendix A are not being reissued.
The numbering system for future amendments to the new Facility Operating License DPR-13 will continue from where Provisional Operating License DPR-13 left off.
The NRC staff's Safety Evaluation Report supporting issuance of the full-term operating license has been issued as NUREG-1443, dated July 1991.
Copies of the report were forwarded to you by letter dated July 25, 1991. In an Environmental Assessment dated September 16, 1991, as noticed in the Federal Register on September 20, 1991 (56 FR 47816), the staff concluded that 9110040254 910926 PDR ADOCK 05000206 P
Mr. Harold B. Ray
-2 A copy of the notice of issuance, which is being forwarded to Office of the Federal Register for publication, is enclosed for your information.
Sincerely, Bruce A. Boger, Director /
Division of Reactor Projects III/IV/V Office of Nuclear Reacto'r Regulation
Enclosures:
- 1. Facility Operating License DPR-13
- 2. Notice of Issuance cc w/enclosures:
See next page DISTRIBUTION:
Docket File NRC & LPDRs RCesaro OGC (M515B18)
TMurley/FMiraglia JPartlow (MS12G18)
BBoger EJordan (MS3701 PDV r/f CGrimes DNash, PTSB PDV p/f WLambe, PTSB GPA/PA (MS2G )
DHagan (MS3206)
OC/LFMB (MS4503)
GHill(4)
HSmith ACRS(1O) (MSP315)
JKopeck,,PA IDintiz, PTSB JDyer GKalman OFC
- LA:PDV
- P:PV
- PD: DV
- OGCGjN
&ADR45/DRPW NAME :B~oer JPartlow (M2le)
NAME :R~~eEaordn (MS3701)irili DATE
- /
/91
- /
/791
- & /
/91
/1/9 OFFICIAL RECORD COPY Document Name:
SO LTR/11232
Mr. Harold B. Ray
-2 a supplement to the Final Environmental Statement, issued in October 1973, was not necessary. Copies of the Environmental Assessment were forwarded to you by letter dated September 16, 1991.
A copy of the notice of issuance, which is being forwarded to Office of the Federal Register for publication, is enclosed for your information.
Sincerely, Bruce A. Boger, Director Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation
Enclosures:
- 1. Facility Operating License DPR-13
- 2. Notice of Issuance cc w/enclosures:
See next page
Mr. Harold B. Ray San Onofre Nuclear Generating Southern California Edison Company Station, Unit No. 1 cc:
Mr. Phil Johnson Mr. Richard J. Kosiba, Project Manager U.S. Nuclear Regulatory Commission Bechtel Power Corporation Region V 12440 E. Imperial Highway 1450 Maria Lane, Suite 210 Norwalk, California 90650 Walnut Creek, California 94596 Mr. Robert G. Lacy Manager, Nuclear Department San Diego Gas & Electric Company P. 0. Box 1831 San Diego, California 92112 Resident Inspector, San Onofre NPS c/o U.S. Nuclear Regulatory Commission P. 0. Box 4329 San Clemente, California 92674 Mayor City of San Clemente 100 Avenida Presidio San Clemente, California 92672 Chairman, Board of Supervisors County of San Diego 1600 Pacific Highway, Room 335 San Diego, California 92101 Regional Administrator, Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Mr. John Hickman Senior Health Physicist Environmental Radioactive Mgmt. Unit Environmental Management Branch State Department of Health Services 714 P Street, Room 616 Sacramento, California 95814 Mr. Don J. Womeldorf Chief, Environmental Management Branch California Department of Health Services 714 P Street, Room 616 Sacramento, California 95814 (9)