ML13308B673

From kanterella
Jump to navigation Jump to search
Responds to NRC Requesting Addl Info Re Review of Geosciences.Forwards Responses to NRC Questions 361.37 Through 361.62 Which Will Be Incorporated in Amend 18 to FSAR
ML13308B673
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 02/15/1980
From: Baskin K
Southern California Edison Co
To: Baer R
Office of Nuclear Reactor Regulation
Shared Package
ML13308B674 List:
References
NUDOCS 8002210374
Download: ML13308B673 (3)


Text

'-A'C-C,'SSIuN NbR4800221037)

DOCDATE.: 80/02/15 NOTA E): NO)

UUCKET FACIL:5O-361*San Onofre

]lear Station, unit 2, SA,'nern Californ 05000361 50-3b2 San (nofre Nuclear Station, Unit 3, Southern Caifr AL Oi1 AUTH.NAME AUTHOR AFFILIATIUN BjASIIN,KP.,

Southern California Edi son Co.

RECIPNAME REC IPIENT AFFILIAT ION SAEiRR.L.

Light fiater Reactors ' 3ranclh 2 SUbJECT: Responds to NRC 791221 ltr request ing acd) info re review of geosciences.Forwards responses to NRC Wuestions 361,37 through 361,62 which' will te incoroorated in Amend 18 to

FSAR, DISTRIBUTION CODE: 6001B COPIES RECEIVED:LIR

-LENCL SIZ:-2,-L TITLE: PSAN/FSAR AMi)T5 and Related Corresponoence NOT ES:A 7-N /C-Z>V'AC ED C-A DhAIE.

ic-v R

IP IENT COPIES RECIPIENT COPIE6 I0 CODE/iVAME LTTR ENCL 10 CODE/NAME LTTR Eir4CL A C TION:

05 P.M 1 601 1

1 A L) CW1,.1 0

B C 1

0 LA 1

0 INTERNAL-: 011g 1

1 02 NRC PR 1

I 06 1 2

2 08 OPERA LIC 8R 1

1 09 GEOSCIEN BR 4

4 10 !)Ab 1

1 11 MrECri ENG 8R 1

1 12 6TRUC ENG SR 1

1 13 NMArL ENG 6,R 2

2 15 REAC SYS BR 1

1 16 ANALY~SIS 0"'

1 1

17 CORE PEi; 6H 1

1 18 AUX SYS 8k 1

1 19 C01f4AIN SYS 1

1 20 1 & C SYS BR 1

1 21 PU~vEk SYS BR 1

1 22 AD) SITE TECH1 1

0 26 ACCONT Ai'4LYS 1

1 21 EFEL TRT SYS 1

1 26 RAD A3AIT 8BR 1

1 29 KIRKAOOL) 1 1

AD FOR ENqG 1

0 At) PLANT SYS I

U AD) REAC SAFETY 1

0 AD SITE AiNLYSiS 1

0 DIRECTOR NRR 1

0 HYL)RO-.:-1E*1EOR 5.R 2

2 YIP4 1

0 DELL) 1 0

EXTERNAL:

03 LPDR 1

1 04 NSIC 1

1 30 ACRS 10 10 FVCEJL r~~~~eS R91uA Iff 7-o 7 TOTAL NUMBER OF COPIES REQJUIRED: LTTR f ENCL 40

Southern California Edison Company P.

0.

8oX 800 2244 WALNUT GROVE AVENUE ROSEMEAD. CALIFORNIA 91770 K. P. BASKIN TELEPHONE MANAGER, NUCLEAR ENGINEERING February 15, 1980 (213) 572-1401 AND LICENSING Director of Nuclear Reactor Regulation Attention: Mr. Robert L. Baer, Chief LWR Branch 2, DPM U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

Subject:

Docket Nos. 50-361 and 50-362 San Onofre Nuclear Generating Station Units 2 and 3 The NRC's letter of December 21, 1979 forwarded requests for additional information in several review areas including geosciences.

Enclosed are sixty-three copies of the responses to these Geosciences Branch Questions (361.37 through 361.62).

The response to questions in the remaining review areas as well as these geosciences responses will be incorporated in Amendment Number 18 to the Final Safety Analysis Report (FSAR).

Due to the volume of the references requested in NRC Questions 361.42 and 361.61 only seven copies of these references are provided.

FSAR Section 1.8 will be revised in Amendment 18 to reflect this seven-copy information; however, no additional copies of the references will be provided with Amendment 18.

Direct distribution of these responses will be made in accordance with the service list provided by SCE's letter of October 29, 1979 to the Commission. An affidavit attesting to the fact that distribution has been completed will be provided within ten days of docketing.

If you have any questions or comments concerning this information, please contact me.

Very truly yours, E

Enclosures VV 22 ~

03 7

R.

L. Baer

-2 cc:

USGS, Menlo Pk., Ca. (Dr. J. Andrews)

USGS, Reston, Va. (J. F. Devine)

Calif. Div. of Mines and Geology (CDMG, P. Amimoto)

D. B. Slemmons