ML13308B533

From kanterella
Jump to navigation Jump to search
Completes Response to Bulletin 74-11, Improper Wiring of Safety Injection Logic at Zion 1 & 2. Instrument & Test Procedure S-11-2.4 Verifies Entire Safeguards Sys Logic & Logic Operability from Process Sensor Inputs to End
ML13308B533
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 11/05/1974
From: Coe R
Southern California Edison Co
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
IEB-74-11, NUDOCS 8103110181
Download: ML13308B533 (1)


Text

Southern California Edison Company P. O. BOX 800 2244 WALNUT GROVE AVENUE ROBERT N. COE ROSEMEAD, CALIFORNIA 91770 TELEPHONE SEmIOR VICE PRESIDENT 213-572-2278 November 5, 1974 United States Atomic Energy Commission PEG..F E

Directorate of Regulatory Operations Region V 1990 North California Boulevard Walnut Creek Plaza, Suite 202 Walnut Creek, California 94596 Docket No. 50-206 San Onofre Unit 1 Attention: Mr. R. H. Engelken Director Gentlemen:

RO Bulletin 74-11 fImproper Wiring of Safety Injection Logic at Zion 1 & 2 Reference is made to your correspondence of October 17, 1974 forwarding the subject RO Bulletin.

We have reviewed the safeguard logic and the methods employed to verify that the system installation is in agreement with vendor speci fications.

San Onofre Unit 1 instrument and Test Procedure S-II-2. 4 verifies the entire safeguards system logic and logic operability from process sensor inputs to final output.

The test is accomplished during each refueling.

The above response completes the investigation requested by your office.

Sincerely,