' Southern California Edison Company
- o. BOX soo, 2244 WALNUT GROVE AVENUE
. T. HEAD, JR RO EMEAD, CALIFORNIA 91770 L 4
,ONE CE PRESIDENT 2' %
M a y.25 977 Rega ory Docket Vi J. S.
Nuclear Regulatory Commission Region V; Office of Inspection and Enforcement Suite 202, Walnut Creek Plaza 1990 North California Boulevard Walnut Creek, California 94596 Attention:
M R. H., Engelken, Directo Docket No. 50 206
Dear Sir:
Reference:
Letter from SCE (R. D. Britt) to
- USNRC, Region V dated May 11, 1977 The referenced letter provided prompt notification to the Regional Office of supports which had been omitted ij!.
from the fuel, oil bypass linese during assembly of the diesel generator units.
This letter is a follow-up report to the notification made in the referenced letter and is submitted in, accordance with the provisions of Section 6.9.2a of Appendix A to the Provisional Operating License No.
DPF -13.'
'444 Engineering staff review of the dfesel generetor manufacturer's seismic qualification documentation raiEed some question concerning the existence of several suppc rts which were to be provided in sections of the fuel oil typass lines for each of the two new diesel generators. Fielc verification led to the conclusion that three supports for
,-Unit 1 diesel generator and two supports for Unit 2,hac been omitted. The bypass lines are located primarily on the diesel generator and auxiliary skids and permit the fl.w of excess fuel oil from the diesel engine back to the fue3 oil day tank.
The missing supports are for piping section. not exceeding two (2) inches in diameter.
T,
.4
'1 44
.A 444 Th
~
4,,
.>~
,~
'4 0I 4
4 4
44.4j 4..
4,444'~9 444
4'4 4
9'.,4,too4 444 4
4444'
,44444'4~44
(.44 4
4,'
~4'4
'43 4
4 4 '
4 4
44
%4
%4.4 4,.4
~
~
~
h 4,
4'..
4,V
R.
H.
Engelk May 25, 1977 As identified in the referenced letter, corrective action included:
(1) Initiation of expedited procurement and installation of the missing supports and.
(2) Review of the balance of diesel generator support systems piping to determine whether, any other support had been omitted.
Regarding item (1),
above, the five (5) missing supports are being obtained from the diesel generator manu facturer.
The three supports for Unit 1 are scheduled to be delivered to the jobsite by May 27, 1977.
The two supports for Unit 2 are scheduled to be delivered to the jobsite by June 3, 1977.
The supports will be installed within the next several work shifts following'delivery.
Regarding item (2), above, review of the balance of diesel generator support system piping indicated that all other supports have been installed, as required.
Enclosed is a completed Licensee Event Report form designated LER 77-7.
If you have any questions concerning this matter, please let me know.
Sincerely, Enclosure cc:
Director, Office of Inspection & Enforcement (40 copies)
Director, Office of Management Information & Program Control (3 copies)
8 Al A.
80 t
I PAA CONTCO (PLEASE PAINV ALLLREGUIED INPOEMAAIKI),
L LICENSE EVENT NAME LICENSE NUMBER TYPE TYPE c0sas l loo 1 lat 1
0 0_ 101 14 11 i [j1 E14 18 25 26 30 31 32 REPORT REPORT CATEGORY TYPE SOURCE DOCKET NUMBER EVENT DATE EPORT DATE LLI.Ji LITJ
[L 1 101 510 1-12 1016 1 51 11 01 71 7 10131 21 3 7171 8
57 58 59 60
- 61.
68 69 74 75 80 EVENT DESCRIPTION 02.-During review of diesel generator manufacturer's sesm r qualificatio0 789 so 03 documentation, it was discovered that supports for sec ions of the fuel 8 9 04 lo bypass linei--s (which peimit. the flow of :excess fue oi from t he-I 80 05 engine to the day tank) for each of two diesel generators were omitted 0during assembly.
Corrective action includes (1) installation of 7189PRIE 80 SYSTEM CAUSE COMPONENT COMPONENT CODE CODE COMPONENT CODE SUPPLIER MANUFACTURER VIOLATION 07 1EIE
[
I EIENIG IIINItFI D
0J 1
01j5 15,1 89 10 11 12 17 43 44 47 48 CAUSE DESCRIPTION 3Piping supports inadvertently omitted during assembly of diesel s 1 7 89 80 generator fuel oil bypass piping.
7 g89 8
10 7.89 FACILITY METHOD OF0 STATUS
% POWER OTHER STATUS DISCOVERY DISCOVERY DESCRIPTION Ei L 10 1 0.
NA I
I [Discovered during documentatitoi 7
8 9
10 12 13 44 45 46 review 80 FORM OF.
8 ACTIVITY CONlTENT RELEASED OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE M2 LNA NA 78 9
10 11 44 45 80 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION
[103 0E 0 NA 7
8 9 11 12 13 8
PERSONNEL INJURIES NUMBER DESCRIPTION L91 oI0 I NA 789 12.80 OFFSITE CONSEQUENCES t
15 NA 789 80 LOSS OR DAMAGE TO FACILITY, TYPE DESCRIPTION
.8 89
'10
-q; 80 1
II z
NA' P BLICITY" s-i.~
NA.
179 t-i,80 "ADDIIONAL FACTORS Description of Event (Cont',d)
- supports and (2)Verificatio thata 19jother sup po rts had-been installe as r equ ired,(.77-)