A L JUN 2 8 1982 Docket Nos.:
50-361 and 50-362 LICENSEES: Southern California Edison Company (SCE)
San Diego Gas & Electric Company City of Anaheim, California City of Riverside, California FACILITY:
San Onofre Nuclear Generating Station, Units 2 & 3
SUBJECT:
SUMMARY
OF MEETING TO DISCUSS CONTROL ROOM PRESSURIZATION TEST On June 24, 1982, members of the NRC staff met with the licensees in Bethesda, Maryland, to discuss the above subject. Attendees at the meeting are given in Enclosur'e 1. Material presented at the meeting by the licensees is given in Enclosure 2.
At the meeting the licensees indicated that they would, in the near future, request a three month extension of the requirement for com pletion of the control room pressurization tests given in condition 2.C(8) of the San Onofre Unif2 Operating License, NPF-10. The reason for the request was an unantfeipated delay in procurement of the fan motors required to acheive the desired pressure in the control room.
The licensees stated that the dampers have been procurred and installed, thereby resulting in partial upgrading of the system.
Harry Rood, Project Manager Licensing Branch No. 3 Division of Licensing
Enclosures:
- 1. List of Attendees
- 2. Handout Material cc:
See next page 8207020040 820628 PDR ADOCK 05000361 P
PDR OFFICE)
LB#3: DL L
DL SURNAME 3 0 C HRO F I IAL FIi
£ u..o:
1980-3298:
NRC FORM 318 410/80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1980-329-824
Mr.
Robert Dietch Vice President Southern California Edison Crmpany 2244 Walnut Grove Avenue P. 0. Box 800 Posemead, California 91770
.. r.
Gary D. Cotton MIr.
Louis Sernath San 3iego Gas & Electric Comoany 101 Ash Street P. 0. Eox 1831 San Diego, California 92112 cc:-. Charles R. Kocher, Esq.
James A. choletto, Esq.
Southern California Edison C.-opany 2244 Walnut Grove Avenue P. 0. Box 800 Rosemead, California 91770 Orrick, Herrington & Sutcliffe ATTN:
David R. Pigott, Esq.
500 Montgomery Street San Francisco, California 94111 Mr.
George Caravaiho City 'Manager City of San Clemente 1.00 Avenido Presidio San Clemente, California 92672 Alan R. Watts, Esq.
Rourke & Woodruff Suite 1020 1355 North Main Street Santa Ana, California 92701 Lawrence Q. Garcia, Esq.
California Public Utilities Commission 5065 State Building
-San Francisco, California 94102 Mr.
V. 'C. Hall Combustion Engineering, Incorporated 1000 Prospect Hill Road indsor, Connecticut 06095
-2 cc:
Mr. S. McClusky Bechtel Power Corporation P. 0. Box 60860, Terminal Annex Los Angeles, California 90060 Mr. Mark Medford Southes-California Edison Company 2244 Walnut Grove Avenue P. 0. Box 800 Rosemead, California 91770 Henry Peters San Dieqo Gas & Electric Company P. 0. Box 1831 San Diego, California 92112 Ms. Lyn Harris Hicks Advocate for GUARD 3908 Calle Ariana San Clemente, California 92672 Richard J. Wharton, Esq.
University of San Diego School of Law Environmental Law Clinic San Diego, California 92110 Phyllis M. Gallagher, Esq.
Suite 222 1695 West Crescent Avenue Anaheim, California 92701 Mr. A. S. Carstens 2071 Caminito Circulo Norte Mt. La Jolla, California 92037 Resident Inspector, San Onofre/NPS c/o U. S. Nuclear Regulatory Commission P.- 0. Box 4329 San C1.emente, California 92672 Charles E. McClung, Jr., Esq.
Attorney at Law 24012 Calle de la Plata Suite 330 Laguna Hills, California 92653
ENCLOSURE 1 LIST OF ATTENDEES June 24, 1982 Meeting Control Room Pressure Testing NRC H. Rood H. Krug T. Quay SCE M. Medford H. Pemberton Bechtel E. Richardson A. Sassi G. Gutmann B. Duncil
CONTROL ROOM COMPLEX PRESSURIZATION TEST o
POSITIVE PRESSURE MEASURED AT APPROXIMATELY 0.05 INCHES W.G.
WITH EMERGENCY SYSTEMS o
ORIGINAL DESIGN REQUIRED SLIGHT POSITIVE PRESSURE o
REQUIREMENT IS 0.125 INCHES W.G. POSITIVE o
TESTS RESULTS INDICATED ISOLATION DAMPER LEAKAGES INSUFFICIENT MAKE-UP AIR TO MAINTAIN REQUIRED POSITIVE PRESSURE I
CDI c:i
CONTROL ROOM COMPLEX HVAC MODIFICATIONS o
REPLACE TEN ISOLATION DAMPERS (FIVE SETS) WITH BUBBLE TYPE LEAK FREE DAMPERS o
INCREASE EMERGENCY MAKE-UP AIR FROM 1000 CFM (NOMINAL) TO 1800 CFM (MAXIMUM)
A
012 D22.1 KITCHEN E
WORK AREA NGI I NEER T//
L OMPUTER CONTROL OLD RM.
GUARD COMPUTER
/Ay oL
/0A' SLAB.
230 RM. 220 LOBBY r~Cc I
rl e 201 p OL A-201~
01 A
/3 NAL 1/ /T b
(//
1950) N701 TOR OR/
ALV2A//
/$OL7/4 DANAN
-a FoAN RxM.
0NICE L
FAN RM. M 233 49INSTRUME 249 21 KCAHC.
UEI I/OV~A1 ACLWORK ARE ENG NE4.
C.1 (i.~q'// /
V~/ps 4~ N2~EC4c. 1./A/IT(r
~
t~
/I5 04.A 7~/
/D 14.Pe-$
I-50LA 7I01v DAAP, OM FIGPT RE 1 - CONTROL ROOM ENVELOPE 30.-" ELEVATION LAM M~~4LA8 230/GUARD COMPU R
-oc*s~
/-50A7I0N1 DAIZ?
IYA1 N64M 1-50LA 7104' DAHIPE,?
%'o~a'Mf roLTkrA/C A/
AA0
/
~~LOBBY
A161,/ /FE///lZ//A//
/o50lAT710/
(/V
,0A/A/L LC)
/A D/r7 VS 1" 7 VI A/I/V 41A CON'T/,?oL 4a&A 9'-O LLE-V4 T/V
-~
~
? E7.M7 A: IV A//? 1-LA 710/N LA/&C4M~'l
~
/
~j(~ I A/1Z'E4" L I.4AO1A1C-a (CA~ro&)
I A.C.IoolV I
a j/07 J ACA /7d 1 t/
I A
/,iO A)1POW MS / 7L f'A/
I A~c.1IA'/7IOLA 77O CL. 30-o_
_ j
-5 L-C 17.*
- a.
~CT4NL 4C 7101V-3
'c T/ON -C.
CONTROL ROOM COMPLEX HVAC MODIFICATIONS SCHEDULE o
OPERATING LICENSE CONDITION REQUIRES IMPLEMENTATION OF MODIFICATIONS TO ACHIEVE 0.125 INCHES W.G. POSITIVE PRESSURE BY AUGUST 1, 1982 o
DELIVERY OF REPLACEMENT SEISMIC FAN AND CLASS 1E MOTORS DELAYED FROM REQUIRED DATE OF 6/15/82 TO 7/9/82 o
EARLIEST COMPLETION OF DESIGN CHANGE PACKAGE AND ENGINEERING VERIFICATION FORECAST FOR 9/1/82 o
DUE TO UNCERTAINTIES OF EQUIPMENT DELIVERY (I.E., 7/9/82 IS EARLIEST POSSIBLE DATE) PROBABLE CONSTRUCTION COMPLETION 9/15/82 TO 10/1/82 o
BASED ON THE ABOVE, 11/1/82 IS REQUESTED FOR OPERATING LICENSE CONDITION
COWQRL R~OOW COMPLEX( HVAC ISOLATIOH PAMIFEIS AWJ IAAKeLJP UNITS WOOL-A -f I
sL&IIATIOI PAW12
~
~
~
~
ffROA K5C 5PWC I~r1 l
P~ Fr flhiI ()UKF-TWOy AeFA.1:ICATOi/d6ISIC, WI W5,, is r 1, Qq A WT PA alp CLA5
-A JS AP Pw~
M4OTO95 PA$MT~
1~l MOTO F
7F fwJi~C ACC4
Meeting Summary
- 2 San Onofre 2 & 3 Distribution Document Control (50-361/362)
NRC PDR L PDR PRC System NS IC LB#3 Reading J. Lee H. Rood Attorney, OELD I&E Regional Administrator, Region Resident Inspector H. Krug T. Quay Service List